Simulation of sediment yield and evaluation of best management practices in Azuari watershed, Upper Blue Nile Basin

IF 1.5 Q4 WATER RESOURCES
Mamaru Bitew Mequanient, Habtamu Hailu Kebede
{"title":"Simulation of sediment yield and evaluation of best management practices in Azuari watershed, Upper Blue Nile Basin","authors":"Mamaru Bitew Mequanient, Habtamu Hailu Kebede","doi":"10.2166/h2oj.2023.159","DOIUrl":null,"url":null,"abstract":"Abstract This study was conducted to simulate the sediment yield and evaluate best management practices (BMPs) for sediment control in the Azuari watershed, Upper Blue Nile basin, Ethiopia using the Soil and Water Assessment Tool (SWAT) model. As inputs for the model, 30 years (1991–2020) of daily values of meteorological data were used. For model simulation, daily stream flow and sediment data were collected for the periods from 1988 to 2012. The study area was delineated into 19 subwatersheds and the sediment yield was estimated in each subwatershed using the modified universal soil loss equation. The average simulated sediment yield in the watershed was found to be 10.81 t/ha/yr. Six subwatersheds were identified to have high to severe sediment yields and are considered hotspot areas which require prior mitigation measures to control sediment. Four soil and conservation measures were evaluated in SWAT as BMPs namely filter strip, terracing, strip cropping, and contouring. Filter strip was found to reduce sediment by 35.61%, terracing by 20.44%, strip cropping by 44.12%, and contouring by 43.6%. Thus, the implementation of strip cropping resulted in maximum sediment yield reduction. The findings of the study would help to make informed decisions on best watershed management strategies.","PeriodicalId":36060,"journal":{"name":"H2Open Journal","volume":null,"pages":null},"PeriodicalIF":1.5000,"publicationDate":"2023-09-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"H2Open Journal","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.2166/h2oj.2023.159","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"Q4","JCRName":"WATER RESOURCES","Score":null,"Total":0}
引用次数: 0

Abstract

Abstract This study was conducted to simulate the sediment yield and evaluate best management practices (BMPs) for sediment control in the Azuari watershed, Upper Blue Nile basin, Ethiopia using the Soil and Water Assessment Tool (SWAT) model. As inputs for the model, 30 years (1991–2020) of daily values of meteorological data were used. For model simulation, daily stream flow and sediment data were collected for the periods from 1988 to 2012. The study area was delineated into 19 subwatersheds and the sediment yield was estimated in each subwatershed using the modified universal soil loss equation. The average simulated sediment yield in the watershed was found to be 10.81 t/ha/yr. Six subwatersheds were identified to have high to severe sediment yields and are considered hotspot areas which require prior mitigation measures to control sediment. Four soil and conservation measures were evaluated in SWAT as BMPs namely filter strip, terracing, strip cropping, and contouring. Filter strip was found to reduce sediment by 35.61%, terracing by 20.44%, strip cropping by 44.12%, and contouring by 43.6%. Thus, the implementation of strip cropping resulted in maximum sediment yield reduction. The findings of the study would help to make informed decisions on best watershed management strategies.
上青尼罗盆地Azuari流域产沙量模拟及最佳管理措施评价
摘要/ Abstract摘要:本研究采用水土评估工具(SWAT)模型,对埃塞俄比亚上青尼罗流域Azuari流域的产沙量进行了模拟,并评价了泥沙控制的最佳管理措施(BMPs)。模型的输入采用了30年(1991-2020)的日气象数据值。在模式模拟中,收集了1988 - 2012年期间的日流量和泥沙数据。将研究区划分为19个小流域,利用修正的通用水土流失方程估算了每个小流域的产沙量。流域平均模拟产沙量为10.81 t/ha/年。确定了6个子流域的产沙量高到严重,被认为是热点地区,需要事先采取缓解措施来控制泥沙。评价了四种土壤保持措施,即过滤带、梯田、带状种植和等高线。过滤带减少泥沙35.61%,梯田减少20.44%,带状种植减少44.12%,等高线减少43.6%。因此,带状种植的实施导致了最大限度的泥沙产量减少。这项研究的结果将有助于就最佳流域管理战略作出明智的决定。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 求助全文
来源期刊
H2Open Journal
H2Open Journal Environmental Science-Environmental Science (miscellaneous)
CiteScore
3.30
自引率
4.80%
发文量
47
审稿时长
24 weeks
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信