A construction process for hoisting, precise positioning and temporary fixation of a steel-concrete composite segment on a long-span steel-concrete hybrid girder
{"title":"A construction process for hoisting, precise positioning and temporary fixation of a steel-concrete composite segment on a long-span steel-concrete hybrid girder","authors":"","doi":"10.25236/ajage.2023.050306","DOIUrl":null,"url":null,"abstract":"A steel-concrete composite segment of a steel-concrete hybrid girder features a complex structure and generally encounters difficulties in positioning and temporary fixation. In view of this, this study explored the layout of survey control networks and put forward a method for observing deformation of a concrete box girder at the cantilever end at the steel-concrete composite segment based on Hanzhuang Grand Canal Bridge, Tai’erzhuang District, Zaozhuang City, Shandong Province, China. Moreover, a construction process for hoisting the steel-concrete composite segment was proposed and a temporary fixation device for the segment used with a hanging basket was developed. The key sequences of temporary fixation were researched, which could provide practical and technological reference for similar engineering.","PeriodicalId":441364,"journal":{"name":"Academic Journal of Architecture and Geotechnical Engineering","volume":"4 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2023-01-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Academic Journal of Architecture and Geotechnical Engineering","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.25236/ajage.2023.050306","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0
Abstract
A steel-concrete composite segment of a steel-concrete hybrid girder features a complex structure and generally encounters difficulties in positioning and temporary fixation. In view of this, this study explored the layout of survey control networks and put forward a method for observing deformation of a concrete box girder at the cantilever end at the steel-concrete composite segment based on Hanzhuang Grand Canal Bridge, Tai’erzhuang District, Zaozhuang City, Shandong Province, China. Moreover, a construction process for hoisting the steel-concrete composite segment was proposed and a temporary fixation device for the segment used with a hanging basket was developed. The key sequences of temporary fixation were researched, which could provide practical and technological reference for similar engineering.