I.P. Dika Putra Ariantika, I.N. Setiawan, I.W. Sukerayasa
{"title":"ANALISA EKONOMI RANCANGAN PLTS OFF-GRID PADA ADIDAYA WORKSHOP","authors":"I.P. Dika Putra Ariantika, I.N. Setiawan, I.W. Sukerayasa","doi":"10.24843/spektrum.2023.v10.i03.p9","DOIUrl":null,"url":null,"abstract":"The PLTS Off-Grid design at the Adidaya Workshop as an additional power supplier is based on the load needs used for the equipment and operational on the workshop. PLTS Off-Grid features are economically likely to take a long time to make a profit. This study deals with the economic analysis of the PLTS Off-Grid system design using the Net Present Value (NPV) analysis method and aims to find out the comparison projections between output and output of the Off-Grid PLTS project at the Adidaya Workshop during the estimated life of PLTS will operate over 20 years. After the calculation, it was obtained that 1th Scenario using a variation of the solar panel capacity of 300 Wp with a battery of 540 Ah produced the largest RAB demand value worth Rp. by 286.038.441 While the smallest RAB requirement value is generated from 4th Scenario using a variation in solar panel capacity of 300 Wp with a 540 Ah battery worth Rp 252.093.730. The largest and the smallest NPV values are also generated by 1th and 4th Scenario with the NPV value of -Rp 316.734.509 and –Rp 251.285.665.","PeriodicalId":30870,"journal":{"name":"Jurnal Ilmiah Spektrum","volume":"45 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2023-09-30","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Jurnal Ilmiah Spektrum","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.24843/spektrum.2023.v10.i03.p9","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0
Abstract
The PLTS Off-Grid design at the Adidaya Workshop as an additional power supplier is based on the load needs used for the equipment and operational on the workshop. PLTS Off-Grid features are economically likely to take a long time to make a profit. This study deals with the economic analysis of the PLTS Off-Grid system design using the Net Present Value (NPV) analysis method and aims to find out the comparison projections between output and output of the Off-Grid PLTS project at the Adidaya Workshop during the estimated life of PLTS will operate over 20 years. After the calculation, it was obtained that 1th Scenario using a variation of the solar panel capacity of 300 Wp with a battery of 540 Ah produced the largest RAB demand value worth Rp. by 286.038.441 While the smallest RAB requirement value is generated from 4th Scenario using a variation in solar panel capacity of 300 Wp with a 540 Ah battery worth Rp 252.093.730. The largest and the smallest NPV values are also generated by 1th and 4th Scenario with the NPV value of -Rp 316.734.509 and –Rp 251.285.665.