ANALISA EKONOMI RANCANGAN PLTS OFF-GRID PADA ADIDAYA WORKSHOP

I.P. Dika Putra Ariantika, I.N. Setiawan, I.W. Sukerayasa
{"title":"ANALISA EKONOMI RANCANGAN PLTS OFF-GRID PADA ADIDAYA WORKSHOP","authors":"I.P. Dika Putra Ariantika, I.N. Setiawan, I.W. Sukerayasa","doi":"10.24843/spektrum.2023.v10.i03.p9","DOIUrl":null,"url":null,"abstract":"The PLTS Off-Grid design at the Adidaya Workshop as an additional power supplier is based on the load needs used for the equipment and operational on the workshop. PLTS Off-Grid features are economically likely to take a long time to make a profit. This study deals with the economic analysis of the PLTS Off-Grid system design using the Net Present Value (NPV) analysis method and aims to find out the comparison projections between output and output of the Off-Grid PLTS project at the Adidaya Workshop during the estimated life of PLTS will operate over 20 years. After the calculation, it was obtained that 1th Scenario using a variation of the solar panel capacity of 300 Wp with a battery of 540 Ah produced the largest RAB demand value worth Rp. by 286.038.441 While the smallest RAB requirement value is generated from 4th Scenario using a variation in solar panel capacity of 300 Wp with a 540 Ah battery worth Rp 252.093.730. The largest and the smallest NPV values are also generated by 1th and 4th Scenario with the NPV value of -Rp 316.734.509 and –Rp 251.285.665.","PeriodicalId":30870,"journal":{"name":"Jurnal Ilmiah Spektrum","volume":"45 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2023-09-30","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Jurnal Ilmiah Spektrum","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.24843/spektrum.2023.v10.i03.p9","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

Abstract

The PLTS Off-Grid design at the Adidaya Workshop as an additional power supplier is based on the load needs used for the equipment and operational on the workshop. PLTS Off-Grid features are economically likely to take a long time to make a profit. This study deals with the economic analysis of the PLTS Off-Grid system design using the Net Present Value (NPV) analysis method and aims to find out the comparison projections between output and output of the Off-Grid PLTS project at the Adidaya Workshop during the estimated life of PLTS will operate over 20 years. After the calculation, it was obtained that 1th Scenario using a variation of the solar panel capacity of 300 Wp with a battery of 540 Ah produced the largest RAB demand value worth Rp. by 286.038.441 While the smallest RAB requirement value is generated from 4th Scenario using a variation in solar panel capacity of 300 Wp with a 540 Ah battery worth Rp 252.093.730. The largest and the smallest NPV values are also generated by 1th and 4th Scenario with the NPV value of -Rp 316.734.509 and –Rp 251.285.665.
离网 plts 经济分析研讨会
Adidaya车间的PLTS离网设计作为额外的电源供应商是基于设备和车间运行的负载需求。PLTS离网功能在经济上可能需要很长时间才能盈利。本研究采用净现值(NPV)分析方法对PLTS离网系统设计进行经济分析,旨在找出Adidaya车间离网PLTS项目在PLTS预计运行寿命超过20年期间的产量与产量的比较预测。经计算得出,第1种情况下,当太阳能电池板容量为300 Wp,电池容量为540 Ah时,产生的RAB需求值最大,为Rp。而最小的RAB要求值是在第4种情况下产生的,使用300 Wp的太阳能电池板容量变化和价值252.093.730卢比的540 Ah电池。情景1和情景4的NPV值最大、最小,分别为-Rp 316.734.509和-Rp 251.285.665。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 求助全文
来源期刊
自引率
0.00%
发文量
0
审稿时长
24 weeks
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:604180095
Book学术官方微信