Life cycle analysis of reinforced concrete floor slab through three different waste management scenarios

Građevinar Pub Date : 2023-09-01 DOI:10.14256/jce.3696.2023
{"title":"Life cycle analysis of reinforced concrete floor slab through three different waste management scenarios","authors":"","doi":"10.14256/jce.3696.2023","DOIUrl":null,"url":null,"abstract":"This paper presents a life cycle analysis (LCA) of a reinforced concrete floor slab with special emphasis on the end of life (EoL). Three EoL waste management scenarios were presented: Scenario I (current situation of construction and demolition waste management in the Republic of Croatia), Scenario II (100% landfilling of construction and demolition waste), and Scenario III (complete recycling of construction and demolition waste). The aim of this study is to demonstrate the environmental benefits of recycling in terms of sustainable construction and to determine the phases in the life of reinforced concrete floor slabs that have the greatest negative impact on the environment. From the analysis, the largest negative contribution to the environmental impacts is in the production phase, which includes the supply of raw materials, their processing, and the transportation of products to the concrete and reinforcement plants. EoL analysis showed that the manner in which construction and demolition waste is managed has a significant impact on the values of the impact categories of human toxicity (HTP), freshwater and marine aquatic ecotoxicity (FAETP and MAETP), terrestrial ecotoxicity (TETP), and eutrophication (EP). Conducting an LCA focusing on the EoL is critical, as it can provide valuable insights into the environmental impacts of the disposal phase and help develop strategies for sustainable waste management.","PeriodicalId":145265,"journal":{"name":"Građevinar","volume":"78 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2023-09-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Građevinar","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.14256/jce.3696.2023","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

Abstract

This paper presents a life cycle analysis (LCA) of a reinforced concrete floor slab with special emphasis on the end of life (EoL). Three EoL waste management scenarios were presented: Scenario I (current situation of construction and demolition waste management in the Republic of Croatia), Scenario II (100% landfilling of construction and demolition waste), and Scenario III (complete recycling of construction and demolition waste). The aim of this study is to demonstrate the environmental benefits of recycling in terms of sustainable construction and to determine the phases in the life of reinforced concrete floor slabs that have the greatest negative impact on the environment. From the analysis, the largest negative contribution to the environmental impacts is in the production phase, which includes the supply of raw materials, their processing, and the transportation of products to the concrete and reinforcement plants. EoL analysis showed that the manner in which construction and demolition waste is managed has a significant impact on the values of the impact categories of human toxicity (HTP), freshwater and marine aquatic ecotoxicity (FAETP and MAETP), terrestrial ecotoxicity (TETP), and eutrophication (EP). Conducting an LCA focusing on the EoL is critical, as it can provide valuable insights into the environmental impacts of the disposal phase and help develop strategies for sustainable waste management.
通过三种不同废物处理方案分析钢筋混凝土楼板的生命周期
本文提出了一种钢筋混凝土楼盖的生命周期分析(LCA)方法,并着重讨论了楼盖的寿命终止(EoL)问题。提出了三种EoL废物管理情景:情景I(克罗地亚共和国建筑和拆除废物管理现状)、情景II(建筑和拆除废物100%填埋)和情景III(建筑和拆除废物完全回收利用)。本研究的目的是在可持续建筑方面展示回收的环境效益,并确定钢筋混凝土楼板的生命周期中对环境产生最大负面影响的阶段。从分析来看,对环境影响最大的负面贡献是在生产阶段,包括原材料的供应、加工和产品到混凝土和钢筋厂的运输。EoL分析表明,建筑和拆除垃圾的管理方式对人类毒性(HTP)、淡水和海洋水生生态毒性(FAETP和MAETP)、陆地生态毒性(TETP)和富营养化(EP)的影响类别值有显著影响。进行以环境效益为重点的生命周期分析至关重要,因为它可以提供有关处置阶段对环境影响的宝贵见解,并有助于制定可持续废物管理策略。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 求助全文
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信