{"title":"A Prediction Method of Ground Deformation in Subway Tunnel Construction based on Gaussian Process Regression","authors":"Dong-xia Liu, Yan Zhou","doi":"10.1109/IAAI51705.2020.9332896","DOIUrl":null,"url":null,"abstract":"With the continuous development of urban traffic, the coverage area of the subway has gradually expanded, and the number of subway tunnel construction has increased significantly. To ensure that the construction process does not affect the ground, the ground deformation prediction method of subway tunnel construction is often used to predict the ground conditions. The method is not strong enough to analyze the ground deformation mechanism, which causes the problem that the predicted result is quite different from the measured result. Therefore, a prediction method of ground deformation based on Gaussian process regression is proposed. Set the ground displacement monitoring process, combined with the characteristics of tunnel construction, complete the monitoring and analysis of ground displacement data. The mechanism of ground deformation is analyzed, and combined with the grey prediction model, the ground deformation is predicted. Based on Gaussian process regression equation and covariance calculation results, a ground deformation prediction model is established. So far, the design of ground deformation prediction method for subway tunnel construction based on Gaussian process regression is completed. Constructing the experimental link, the comparison shows that the prediction result of this method is closer to the actual measurement result, which shows that this method is more effective for ground deformation prediction.","PeriodicalId":232194,"journal":{"name":"2020 IEEE International Conference on Industrial Application of Artificial Intelligence (IAAI)","volume":"2 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2020-12-25","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"2020 IEEE International Conference on Industrial Application of Artificial Intelligence (IAAI)","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/IAAI51705.2020.9332896","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

Abstract

With the continuous development of urban traffic, the coverage area of the subway has gradually expanded, and the number of subway tunnel construction has increased significantly. To ensure that the construction process does not affect the ground, the ground deformation prediction method of subway tunnel construction is often used to predict the ground conditions. The method is not strong enough to analyze the ground deformation mechanism, which causes the problem that the predicted result is quite different from the measured result. Therefore, a prediction method of ground deformation based on Gaussian process regression is proposed. Set the ground displacement monitoring process, combined with the characteristics of tunnel construction, complete the monitoring and analysis of ground displacement data. The mechanism of ground deformation is analyzed, and combined with the grey prediction model, the ground deformation is predicted. Based on Gaussian process regression equation and covariance calculation results, a ground deformation prediction model is established. So far, the design of ground deformation prediction method for subway tunnel construction based on Gaussian process regression is completed. Constructing the experimental link, the comparison shows that the prediction result of this method is closer to the actual measurement result, which shows that this method is more effective for ground deformation prediction.
基于高斯过程回归的地铁隧道施工地基变形预测方法
随着城市交通的不断发展,地铁的覆盖范围逐渐扩大,地铁隧道建设数量明显增加。为保证施工过程不影响地面,常采用地铁隧道施工地面变形预测方法对地面状况进行预测。该方法对地表变形机理的分析力度不够,导致预测结果与实测结果相差较大。为此,提出了一种基于高斯过程回归的地面变形预测方法。设定了地面位移监测流程,结合隧道施工特点,完成了对地面位移数据的监测与分析。分析了地表变形的机理,并结合灰色预测模型对地表变形进行了预测。根据高斯过程回归方程和协方差计算结果,建立了地面变形预测模型。至此,基于高斯过程回归的地铁隧道施工地面变形预测方法设计完成。构建实验环节,对比表明,该方法的预测结果更接近实际测量结果,表明该方法对地面变形预测更为有效。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 求助全文
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:604180095
Book学术官方微信
小红书