Influence of the Management Styles and Quality of Management on Project Delivery

O. A. Aiyetan
{"title":"Influence of the Management Styles and Quality of Management on Project Delivery","authors":"O. A. Aiyetan","doi":"10.15641/JCBM.3.1.65","DOIUrl":null,"url":null,"abstract":"Construction projects differ in features and complexity to each passing decade. Therefore, control is a fundamental requirement to avoid overruns of key performance parameters. The study aims to identify influencing factors of management practices and quality of management during construction on project delivery time to mitigate their impact. The inferential statistic was used in the analysis of data for the study. The sample population consists of architects; builders; quantity surveyors; structural engineers, and clients, totalling eighty-eight (88). The metropolitan cities of five provinces constituted the geographical delimitation of the study. The provinces are Eastern Cape; Free State; Gauteng; KwaZulu-Natal, and Western Cape, while the metropolitan cities are Bloemfontein; Cape Town; Durban; Johannesburg, and Port Elizabeth. The probability sampling method was employed in the selection of architects, South African property owner's, and masters builders. While stratified sampling was used for quantity surveyors. A questionnaire survey was conducted among these stakeholders in the Building Construction Industry to access influencing factors of management style and quality of management during construction. Finding relative to management style include that set time limits, specify goals people are to accomplish and require regular reporting on progress and for quality of management during construction are effectively coordinating resources, developing an appropriate organizational structure to maintain workflow influences project delivery time  In most cases these tradesmen require supervision construction, which results in delay and attending, may drastically reduce delay on projects. Based on the finding of the study, ways to mitigate poor management style and quality of management during construction were suggested. \nKeywords: Construction, Delivery time, Management style, Quality.","PeriodicalId":149221,"journal":{"name":"Journal of Construction Business and Management","volume":"4 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2019-02-12","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Journal of Construction Business and Management","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.15641/JCBM.3.1.65","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

Abstract

Construction projects differ in features and complexity to each passing decade. Therefore, control is a fundamental requirement to avoid overruns of key performance parameters. The study aims to identify influencing factors of management practices and quality of management during construction on project delivery time to mitigate their impact. The inferential statistic was used in the analysis of data for the study. The sample population consists of architects; builders; quantity surveyors; structural engineers, and clients, totalling eighty-eight (88). The metropolitan cities of five provinces constituted the geographical delimitation of the study. The provinces are Eastern Cape; Free State; Gauteng; KwaZulu-Natal, and Western Cape, while the metropolitan cities are Bloemfontein; Cape Town; Durban; Johannesburg, and Port Elizabeth. The probability sampling method was employed in the selection of architects, South African property owner's, and masters builders. While stratified sampling was used for quantity surveyors. A questionnaire survey was conducted among these stakeholders in the Building Construction Industry to access influencing factors of management style and quality of management during construction. Finding relative to management style include that set time limits, specify goals people are to accomplish and require regular reporting on progress and for quality of management during construction are effectively coordinating resources, developing an appropriate organizational structure to maintain workflow influences project delivery time  In most cases these tradesmen require supervision construction, which results in delay and attending, may drastically reduce delay on projects. Based on the finding of the study, ways to mitigate poor management style and quality of management during construction were suggested. Keywords: Construction, Delivery time, Management style, Quality.
管理风格和管理质量对项目交付的影响
随着时间的推移,建筑项目的特点和复杂性也有所不同。因此,控制是避免关键性能参数超支的基本要求。本研究旨在找出施工期间管理实务及管理质素对项目交货期的影响因素,以减轻其影响。本研究资料分析采用推论统计方法。样本人口包括建筑师;建造者;测量师;结构工程师和客户共88人。五个省的大都市区构成了研究的地理界限。各省是东开普省;自由状态;豪登省;夸祖鲁-纳塔尔省和西开普省,而大城市是布隆方丹;开普敦;德班;约翰内斯堡和伊丽莎白港。采用概率抽样方法对建筑师、南非业主和建筑大师进行了选择。而工料调查员则采用分层抽样。通过问卷调查的方式,对建筑行业的利益相关者进行问卷调查,了解建筑施工过程中管理方式和管理质量的影响因素。与管理风格相关的发现包括设定时间限制,指定人们要完成的目标,要求定期报告进度,以及施工期间的质量管理,有效地协调资源,制定适当的组织结构以保持工作流程影响项目交付时间。在大多数情况下,这些商人需要监督施工,这导致延迟和参加,可能会大大减少项目的延迟。根据研究结果,提出了改善施工过程中管理方式和管理质量的方法。关键词:施工,交货期,管理方式,质量。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 求助全文
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信