{"title":"CASPPR - An OTEC Slope-Mounted Cold Water Pipe Foundation System","authors":"J. Giannotti, S. Bailey, M. Blandon","doi":"10.1109/OCEANS.1983.1152107","DOIUrl":null,"url":null,"abstract":"Installation of Ocean Thermal Energy Conversion Power Stations on shoreline or offshore platforms will require lengthy, bottom-following seawater pipes. A conceptual design study was conducted to address the technology required of deepwater, large diameter pipe laying with particular emphasis on the selection of foundation concepts and installation procedures. The study (Giannotti & Associates, Inc., Ref. [1]) was the development of the pipeline installation concept, Cable Supported Pipe with Piecewise Replacement (CASPPR).","PeriodicalId":137921,"journal":{"name":"Proceedings OCEANS '83","volume":"33 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"1900-01-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Proceedings OCEANS '83","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/OCEANS.1983.1152107","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

Abstract

Installation of Ocean Thermal Energy Conversion Power Stations on shoreline or offshore platforms will require lengthy, bottom-following seawater pipes. A conceptual design study was conducted to address the technology required of deepwater, large diameter pipe laying with particular emphasis on the selection of foundation concepts and installation procedures. The study (Giannotti & Associates, Inc., Ref. [1]) was the development of the pipeline installation concept, Cable Supported Pipe with Piecewise Replacement (CASPPR).
CASPPR - OTEC斜坡式冷水管道基础系统
在海岸线或海上平台上安装海洋热能转换发电站将需要长时间的海底海水管道。进行了概念设计研究,以解决深水大直径管道铺设所需的技术,特别强调基础概念和安装程序的选择。这项研究(Giannotti & Associates, Inc., Ref.[1])是管道安装概念的发展,即电缆支撑管道分段更换(CASPPR)。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 求助全文
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:604180095
Book学术官方微信