{"title":"Transmission expansion planning considering wholesale electricity market and integration of renewable generation","authors":"A. Obushevs, I. Oleinikova","doi":"10.1109/EEM.2014.6861230","DOIUrl":null,"url":null,"abstract":"A new network operation conditions creates new requirements for transmission planning which include electricity market figures and considerable integration of renewable generation. This paper focuses on transmission expansion planning techniques in a perfect competitive electricity market based on optimal power flows calculations with development planning and sustainability concept. For the proposed concept validation the Garvers's 6-bus test system was used. The simulation and validation results show the possibility of the ACOPF/DCOPF models implementation to transmission planning tasks solution.","PeriodicalId":261127,"journal":{"name":"11th International Conference on the European Energy Market (EEM14)","volume":"81 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2014-05-28","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"3","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"11th International Conference on the European Energy Market (EEM14)","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/EEM.2014.6861230","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 3
Abstract
A new network operation conditions creates new requirements for transmission planning which include electricity market figures and considerable integration of renewable generation. This paper focuses on transmission expansion planning techniques in a perfect competitive electricity market based on optimal power flows calculations with development planning and sustainability concept. For the proposed concept validation the Garvers's 6-bus test system was used. The simulation and validation results show the possibility of the ACOPF/DCOPF models implementation to transmission planning tasks solution.