{"title":"Comparison of String and Central Inverter for 10MW PV Plant","authors":"B. Atasoy, S. S. Tezcan","doi":"10.1109/ISMSIT52890.2021.9604588","DOIUrl":null,"url":null,"abstract":"In Turkey, solar power technology is quickly advancing, and investors are interested in establishing solar power plant. With the support of YEKDEM(Turkish Renewable Energy Resources Support Mechanism) and YEKA(Regulation on Renewable Energy Zones) mechanisms implemented by the state, solar investments have increased with a very serious momentum in recent years. With the recently announced YEKA GES-4 and YEKA GES-5 projects we foresee that the investments in solar power plants in Turkey will increase rapidly in the future. There is a difference in investment operation and maintenance costs, and operation efficiency of grid-tie inverter technology between string and central inverter. In this stud, we will find the optimum inverter selection by performing cost analysis and annual production with string and central inverter in 10 MW solar power plant.","PeriodicalId":120997,"journal":{"name":"2021 5th International Symposium on Multidisciplinary Studies and Innovative Technologies (ISMSIT)","volume":"12 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2021-10-21","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"3","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"2021 5th International Symposium on Multidisciplinary Studies and Innovative Technologies (ISMSIT)","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/ISMSIT52890.2021.9604588","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 3

Abstract

In Turkey, solar power technology is quickly advancing, and investors are interested in establishing solar power plant. With the support of YEKDEM(Turkish Renewable Energy Resources Support Mechanism) and YEKA(Regulation on Renewable Energy Zones) mechanisms implemented by the state, solar investments have increased with a very serious momentum in recent years. With the recently announced YEKA GES-4 and YEKA GES-5 projects we foresee that the investments in solar power plants in Turkey will increase rapidly in the future. There is a difference in investment operation and maintenance costs, and operation efficiency of grid-tie inverter technology between string and central inverter. In this stud, we will find the optimum inverter selection by performing cost analysis and annual production with string and central inverter in 10 MW solar power plant.
10MW光伏电站串逆变器与中央逆变器的比较
在土耳其,太阳能技术正在迅速发展,投资者对建立太阳能发电厂很感兴趣。在国家实施的YEKDEM(土耳其可再生能源支持机制)和YEKA(可再生能源区监管)机制的支持下,太阳能投资近年来以非常严重的势头增长。随着最近宣布的YEKA GES-4和YEKA GES-5项目,我们预计未来土耳其太阳能发电厂的投资将迅速增加。串式逆变器与集中式逆变器并网逆变器技术在投资、运行维护费用、运行效率等方面存在差异。在本研究中,我们将通过对10 MW太阳能电站的串逆变器和中央逆变器进行成本分析和年生产,找到最佳的逆变器选择。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 求助全文
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信