A Review of Application of Risk Management Techniques in Costing and Evaluating Construction Work Projects in Nigeria: A Mathematical Analysis Approach

S. Uremadu, F. Okafor, Charity E Duru Uremadu
{"title":"A Review of Application of Risk Management Techniques in Costing and Evaluating Construction Work Projects in Nigeria: A Mathematical Analysis Approach","authors":"S. Uremadu, F. Okafor, Charity E Duru Uremadu","doi":"10.32474/CIACR.2018.05.000216","DOIUrl":null,"url":null,"abstract":"There exist some inherent risk elements like physical risk, environmental risk, logistic risk, financial risk, legal risk, political risk,\netc. in the construction work environment in Nigeria. Before now those costing these projects use only contingency sum approach\nand insurance cover without properly taking into consideration all these other critical factors of risk.","PeriodicalId":427316,"journal":{"name":"Current Investigations in Agriculture and Current Research","volume":"92 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2018-11-30","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"1","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Current Investigations in Agriculture and Current Research","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.32474/CIACR.2018.05.000216","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 1

Abstract

There exist some inherent risk elements like physical risk, environmental risk, logistic risk, financial risk, legal risk, political risk, etc. in the construction work environment in Nigeria. Before now those costing these projects use only contingency sum approach and insurance cover without properly taking into consideration all these other critical factors of risk.
风险管理技术在尼日利亚建筑工程项目成本与评估中的应用综述:一种数学分析方法
企业存在着物理风险、环境风险、物流风险、财务风险、法律风险、政治风险等内在风险因素。在尼日利亚的建筑工作环境。在此之前,那些对这些项目进行成本计算的人只使用应急总额方法和保险,而没有适当地考虑所有这些其他关键的风险因素。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 求助全文
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:604180095
Book学术官方微信