Vito Project: Host Construction and Commissioning

Paul Christopher Dixon, Brady Wild, M. Hernáiz, Keith Richard Rush, Greg Neil Smith
{"title":"Vito Project: Host Construction and Commissioning","authors":"Paul Christopher Dixon, Brady Wild, M. Hernáiz, Keith Richard Rush, Greg Neil Smith","doi":"10.4043/32462-ms","DOIUrl":null,"url":null,"abstract":"\n In 2009, the Vito field was discovered in more than 1,200 m of water approximately 240 km offshore from New Orleans, Louisiana in the Gulf of Mexico (GoM). The project produces from reservoirs nearly 9,100 m below sea level. This paper provides the efficiencies in constructing the Vito FPS at a single fabrication yard, commissioning, and preparation for offshore installation. This paper is part of a Vito Project series at OTC 2023 and the other papers are listed in the references.\n The Vito Floating Production System (FPS) has a Lightship of 21,500 mt, Topside Lift Weight of 8,700 mt, and is 86 m Length × 86 m Width overall. Vito FPS fabrication at a single fabrication site included Hull Fabrication, Topside Fabrication, Living Quarters (LQ) Fabrication, Integration, and a majority of the Commissioning Scope. Key drivers to be successful at a single site included demonstratable safe execution, offshore fabrication quality capability, fabrication yard throughput availability, achievable integration execution plan, and competitive pricing. Following a transport to a readiness site adjacent to the Gulf of Mexico, four months of continued commissioning and preparation for offshore installation included the key activities of installation of the Temporary Living Quarters, riser and umbilical installation winches, tow-out and station-keeping rigging; de-preservation, final commissioning and verification of operability of key systems; aviation readiness and safety equipment verification; and final USCG inspections to obtain the Authorization to Proceed Offshore.\n The efficiencies identified and realized at the single fabrication site during the Vito FPS fabrication execution included focused safety at a single site, simplified quality weld procedures, single interface for detail engineering, simplified procurement delivery plan for Company Provided Items (CPI), efficient preservation strategy, single regulatory interface site, enhanced site team efficiencies in engineering and inspection, and simplified contracting at a single source. The readiness site integrated members of the Construction, Commissioning and Operation teams utilizing a single location to quickly mobilize various vendor teams for a final preparation for offshore installation without the constraints of remote offshore work.\n A key enabler to select the fabricator was their ability to complete a majority of the commissioning scope on the ground prior to integration of the complete Topside and Hull based on the single lift capability of the new 2 × 15,000 mt gantry cranes, which further increased the efficiency at the single fabrication site. 85% of the commissioning was completed by a Commissioning Management Contractor (CMC) prior to integration including load testing and dynamic commissioning of all the major rotating equipment.","PeriodicalId":196855,"journal":{"name":"Day 2 Tue, May 02, 2023","volume":null,"pages":null},"PeriodicalIF":0.0000,"publicationDate":"2023-04-24","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"6","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Day 2 Tue, May 02, 2023","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.4043/32462-ms","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 6

Abstract

In 2009, the Vito field was discovered in more than 1,200 m of water approximately 240 km offshore from New Orleans, Louisiana in the Gulf of Mexico (GoM). The project produces from reservoirs nearly 9,100 m below sea level. This paper provides the efficiencies in constructing the Vito FPS at a single fabrication yard, commissioning, and preparation for offshore installation. This paper is part of a Vito Project series at OTC 2023 and the other papers are listed in the references. The Vito Floating Production System (FPS) has a Lightship of 21,500 mt, Topside Lift Weight of 8,700 mt, and is 86 m Length × 86 m Width overall. Vito FPS fabrication at a single fabrication site included Hull Fabrication, Topside Fabrication, Living Quarters (LQ) Fabrication, Integration, and a majority of the Commissioning Scope. Key drivers to be successful at a single site included demonstratable safe execution, offshore fabrication quality capability, fabrication yard throughput availability, achievable integration execution plan, and competitive pricing. Following a transport to a readiness site adjacent to the Gulf of Mexico, four months of continued commissioning and preparation for offshore installation included the key activities of installation of the Temporary Living Quarters, riser and umbilical installation winches, tow-out and station-keeping rigging; de-preservation, final commissioning and verification of operability of key systems; aviation readiness and safety equipment verification; and final USCG inspections to obtain the Authorization to Proceed Offshore. The efficiencies identified and realized at the single fabrication site during the Vito FPS fabrication execution included focused safety at a single site, simplified quality weld procedures, single interface for detail engineering, simplified procurement delivery plan for Company Provided Items (CPI), efficient preservation strategy, single regulatory interface site, enhanced site team efficiencies in engineering and inspection, and simplified contracting at a single source. The readiness site integrated members of the Construction, Commissioning and Operation teams utilizing a single location to quickly mobilize various vendor teams for a final preparation for offshore installation without the constraints of remote offshore work. A key enabler to select the fabricator was their ability to complete a majority of the commissioning scope on the ground prior to integration of the complete Topside and Hull based on the single lift capability of the new 2 × 15,000 mt gantry cranes, which further increased the efficiency at the single fabrication site. 85% of the commissioning was completed by a Commissioning Management Contractor (CMC) prior to integration including load testing and dynamic commissioning of all the major rotating equipment.
Vito项目:主机建设与调试
2009年,Vito油田在距墨西哥湾路易斯安那州新奥尔良约240公里的海面上被发现,水深超过1200米。该项目从海平面以下近9100米的水库中生产。本文介绍了在单个制造场建造Vito FPS、调试和海上安装准备的效率。本文是OTC 2023上Vito项目系列的一部分,其他论文在参考文献中列出。Vito浮式生产系统(FPS)的光船重量为21,500公吨,上部提升重量为8,700公吨,总长度为86米,宽度为86米。在单个制造地点进行的Vito FPS制造包括船体制造、上层甲板制造、生活区(LQ)制造、集成和大部分调试范围。在单个站点成功的关键驱动因素包括可演示的安全执行、海上制造质量能力、制造场地吞吐量可用性、可实现的集成执行计划和有竞争力的价格。在运输到墨西哥湾附近的准备地点后,四个月的持续调试和海上安装准备工作包括安装临时生活区、立管和脐带安装绞车、拖出和站保持索具等关键活动;关键系统的保存、最终调试和可操作性验证;航空准备和安全设备核查;以及USCG的最终检查,以获得海上作业授权。在Vito FPS制造执行过程中,在单个制造现场确定并实现的效率包括单个现场的集中安全、简化的质量焊接程序、详细工程的单一界面、简化的公司提供物品(CPI)的采购交付计划、高效的保存策略、单一监管界面现场、提高现场团队在工程和检查方面的效率,以及简化的单一来源合同。准备现场集成了施工、调试和运营团队的成员,利用一个地点快速动员不同的供应商团队,为海上安装做最后的准备,而不受远程海上工作的限制。选择制造商的一个关键因素是他们有能力在整合整个上层甲板和船体之前完成大部分的地面调试范围,这是基于新的2 × 15,000吨龙门起重机的单次提升能力,这进一步提高了单个制造现场的效率。在整合之前,85%的调试工作由调试管理承包商(CMC)完成,包括所有主要旋转设备的负载测试和动态调试。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 求助全文
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信