{"title":"Settlement Control Technology of High Filled Soil-Rock Embankment in Alpine and High-Altitude Areas","authors":"Guangxi Wu","doi":"10.26689/jwa.v7i4.5277","DOIUrl":null,"url":null,"abstract":"China's infrastructure has gradually achieved large-scale development, and transportation construction has also shifted from east to west, transitioning from plains to mountainous areas. High-fill embankments of different sizes in mountainous areas are unavoidable, and the settlement of high-fill embankments is usually the most concerned issue in high-fill projects. According to the current research results of highway projects, most of the high embankments in mountainous areas are soil-rock mixed embankments or rock-filled embankments, and their post-construction settlements are directly related to construction technology and filler types. The problems existing in the settlement control of earth-filled embankment and related influencing factors are analyzed in detail. At the same time, the settlement control technology of high-fill embankment in high-cold and high-altitude areas is also discussed, so as to ensure the overall quality of high-fill embankment.","PeriodicalId":122520,"journal":{"name":"Journal of World Architecture","volume":"94 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2023-08-29","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Journal of World Architecture","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.26689/jwa.v7i4.5277","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0
Abstract
China's infrastructure has gradually achieved large-scale development, and transportation construction has also shifted from east to west, transitioning from plains to mountainous areas. High-fill embankments of different sizes in mountainous areas are unavoidable, and the settlement of high-fill embankments is usually the most concerned issue in high-fill projects. According to the current research results of highway projects, most of the high embankments in mountainous areas are soil-rock mixed embankments or rock-filled embankments, and their post-construction settlements are directly related to construction technology and filler types. The problems existing in the settlement control of earth-filled embankment and related influencing factors are analyzed in detail. At the same time, the settlement control technology of high-fill embankment in high-cold and high-altitude areas is also discussed, so as to ensure the overall quality of high-fill embankment.