{"title":"Electrical power monitoring and control in 13C isotope separation column boiler","authors":"A. Neaga, C. Festila, E. Dulf, T. Szelitzky, R. Both, C. Pop, M. Gligan","doi":"10.1109/SACI.2012.6249968","DOIUrl":null,"url":null,"abstract":"One of the main elements of a cryogenic (13C) separation column is the boiler. The control of the power supply which feeds the boiler's resistance is of major importance. In order to ensure a safe and stable operation of the plant, a monitoring and control unit is designed using NI PXI-8183 process computer. The developed LabVIEW™ application implements a PI controller and also data logging. Step response and disturbance rejection test are carried out to prove the feasibility of the design.","PeriodicalId":293436,"journal":{"name":"2012 7th IEEE International Symposium on Applied Computational Intelligence and Informatics (SACI)","volume":"24 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2012-05-24","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"1","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"2012 7th IEEE International Symposium on Applied Computational Intelligence and Informatics (SACI)","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/SACI.2012.6249968","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 1
Abstract
One of the main elements of a cryogenic (13C) separation column is the boiler. The control of the power supply which feeds the boiler's resistance is of major importance. In order to ensure a safe and stable operation of the plant, a monitoring and control unit is designed using NI PXI-8183 process computer. The developed LabVIEW™ application implements a PI controller and also data logging. Step response and disturbance rejection test are carried out to prove the feasibility of the design.