Identification of Gas Accumulation Susceptibility in NPP’s Safety Related Systems and Operability Evaluation due to Gas Transportation

Zhen-Yu Hung, Pei-Hsun Huang, Chaojun Li
{"title":"Identification of Gas Accumulation Susceptibility in NPP’s Safety Related Systems and Operability Evaluation due to Gas Transportation","authors":"Zhen-Yu Hung, Pei-Hsun Huang, Chaojun Li","doi":"10.1115/ICONE26-81074","DOIUrl":null,"url":null,"abstract":"Instances of gas accumulation in the subject systems have occurred since the beginning of commercial nuclear power plant operation. NRC Generic Letter 2008-01, “requests that each licensee evaluate its ECCS, DHR system, and Containment Spray system licensing basis, design, testing and corrective actions to ensure that gas accumulation is maintained less than the amount that challenges operability of these systems, and that appropriate action is taken when conditions adverse to quality are identified.” All of the three NPPs have accomplished this evaluation and propose some corrective measures like revision of the operation procedures, installing the venting valves etc. Taipower also committed AEC to establish the acceptable quantity of the gas accumulation and continue to follow the development of gas transport methodologies in the industry. According to the NRC NRR Action Plan TAC.NO. ME3939 GAS MANAGEMENT (March 2011), other safety related systems, in additional to the systems covered by GL 2008-01, also have the gas accumulation issue and therefore must be concerned. This project will develop the numerical evaluation process with two phase flow software to simulate the gas accumulation and the transportation phenomena for the GL 2008-01 systems and validate the results by experimental analysis.","PeriodicalId":394688,"journal":{"name":"Volume 4: Nuclear Safety, Security, and Cyber Security; Computer Code Verification and Validation","volume":"2 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2018-07-22","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Volume 4: Nuclear Safety, Security, and Cyber Security; Computer Code Verification and Validation","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1115/ICONE26-81074","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

Abstract

Instances of gas accumulation in the subject systems have occurred since the beginning of commercial nuclear power plant operation. NRC Generic Letter 2008-01, “requests that each licensee evaluate its ECCS, DHR system, and Containment Spray system licensing basis, design, testing and corrective actions to ensure that gas accumulation is maintained less than the amount that challenges operability of these systems, and that appropriate action is taken when conditions adverse to quality are identified.” All of the three NPPs have accomplished this evaluation and propose some corrective measures like revision of the operation procedures, installing the venting valves etc. Taipower also committed AEC to establish the acceptable quantity of the gas accumulation and continue to follow the development of gas transport methodologies in the industry. According to the NRC NRR Action Plan TAC.NO. ME3939 GAS MANAGEMENT (March 2011), other safety related systems, in additional to the systems covered by GL 2008-01, also have the gas accumulation issue and therefore must be concerned. This project will develop the numerical evaluation process with two phase flow software to simulate the gas accumulation and the transportation phenomena for the GL 2008-01 systems and validate the results by experimental analysis.
核电厂安全相关系统气体聚集敏感性辨识及运气可操作性评价
自商业核电站开始运行以来,就发生了主体系统中气体积聚的情况。NRC通用函2008-01“要求每个被许可方评估其ECCS, DHR系统和密封喷雾系统许可基础,设计,测试和纠正措施,以确保气体积聚保持在挑战这些系统可操作性的量以下,并在确定不利质量条件时采取适当措施。”三个核电站都完成了评估,并提出了一些整改措施,如修改操作规程、安装排气阀等。台电亦承诺AEC建立可接受的天然气累积量,并继续跟进业界天然气输送方法的发展。根据NRC NRR行动计划TAC.NO。ME3939气体管理(2011年3月),除了GL 2008-01所涵盖的系统之外,其他与安全相关的系统也存在气体积聚问题,因此必须予以关注。本项目将利用两相流软件开发数值评价流程,模拟GL 2008-01系统的天然气聚集和输运现象,并通过实验分析验证结果。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 求助全文
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:604180095
Book学术官方微信