Research on Container Slot Planning for Coordinated Operation of Quay Cranes and Yard Cranes

Lili Huang, Weimin Wu
{"title":"Research on Container Slot Planning for Coordinated Operation of Quay Cranes and Yard Cranes","authors":"Lili Huang, Weimin Wu","doi":"10.1109/ICNSC52481.2021.9702197","DOIUrl":null,"url":null,"abstract":"Given ship per-stowage plan and yard stacking status, this paper presents a method on container slot planning for coordinated operation of quay cranes (QC) and yard cranes (YC). A multi-objective programming model is established with the goal of maximizing the turnover rate of container terminal. Then, a heuristic construction algorithm is designed to obtain an initial stowage plan. In addition, an annealing genetic algorithm is proposed to optimize this initial solution. A wide variety of numerical experiments demonstrated that stowage plans made by this method are useful and applicable in practice.","PeriodicalId":129062,"journal":{"name":"2021 IEEE International Conference on Networking, Sensing and Control (ICNSC)","volume":"255 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2021-12-03","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"2021 IEEE International Conference on Networking, Sensing and Control (ICNSC)","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/ICNSC52481.2021.9702197","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

Abstract

Given ship per-stowage plan and yard stacking status, this paper presents a method on container slot planning for coordinated operation of quay cranes (QC) and yard cranes (YC). A multi-objective programming model is established with the goal of maximizing the turnover rate of container terminal. Then, a heuristic construction algorithm is designed to obtain an initial stowage plan. In addition, an annealing genetic algorithm is proposed to optimize this initial solution. A wide variety of numerical experiments demonstrated that stowage plans made by this method are useful and applicable in practice.
码头起重机与堆场起重机协同作业集装箱槽位规划研究
根据船舶配载计划和堆场堆垛情况,提出了一种码头起重机与堆场起重机协同作业的集装箱槽位规划方法。建立了以集装箱码头周转率最大化为目标的多目标规划模型。然后,设计了一种启发式构造算法来获得初始积载方案。此外,提出了一种退火遗传算法来优化该初始解。大量的数值试验表明,用该方法编制的配载方案是可行的。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 求助全文
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信