A Combined Nonlinear Least Squares and Evolutionary Method for Cost Approximation Model of Gas-Fired Power Plants in Indonesia

Muhammad Idris, S. I. Visang Fardha, H. Kartika Raras
{"title":"A Combined Nonlinear Least Squares and Evolutionary Method for Cost Approximation Model of Gas-Fired Power Plants in Indonesia","authors":"Muhammad Idris, S. I. Visang Fardha, H. Kartika Raras","doi":"10.1109/ICT-PEP57242.2022.9988974","DOIUrl":null,"url":null,"abstract":"The project cost estimate is one of the crucial stages in the total project's planning activities. It deals with how much the cost would be spent on the project. As the cleanest fossil fuel, natural gas has a strategic role in domestic energy. Therefore, gas-fired power plants (GFPPs), which comprise gas turbine power plant (GTPP), gas engine power plant (GEPP) and combined-cycled power plant (CCPP), are still promising to serve electricity demand. Moreover, the growth of renewable energy is still low. A lack of knowledge of project cost estimates and the database of existing project costs have initiated finding the project cost approximation by a mathematical model. The study aims to present an overview of project cost estimates for several types of GFPPs in Indonesia based on existing contract projects or original equipment manufacturer (OEM) data sets. The cost estimate of GFPP was approximated by a combined nonlinear least square and evolutionary algorithm as a proposed method. The findings of the study show that the approximation function model for each type of GFPP was a nonlinear-power function. The three performance criteria were evaluated. GTCC and CCPP have better performance criteria than GEPP due to more data sets. However, the results can be applied as one reference for budgeting or planning purposes and are not recommended for detailed estimation in procurement or project execution due to the low definition of project.","PeriodicalId":163424,"journal":{"name":"2022 International Conference on Technology and Policy in Energy and Electric Power (ICT-PEP)","volume":"49 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2022-10-18","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"2022 International Conference on Technology and Policy in Energy and Electric Power (ICT-PEP)","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/ICT-PEP57242.2022.9988974","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

Abstract

The project cost estimate is one of the crucial stages in the total project's planning activities. It deals with how much the cost would be spent on the project. As the cleanest fossil fuel, natural gas has a strategic role in domestic energy. Therefore, gas-fired power plants (GFPPs), which comprise gas turbine power plant (GTPP), gas engine power plant (GEPP) and combined-cycled power plant (CCPP), are still promising to serve electricity demand. Moreover, the growth of renewable energy is still low. A lack of knowledge of project cost estimates and the database of existing project costs have initiated finding the project cost approximation by a mathematical model. The study aims to present an overview of project cost estimates for several types of GFPPs in Indonesia based on existing contract projects or original equipment manufacturer (OEM) data sets. The cost estimate of GFPP was approximated by a combined nonlinear least square and evolutionary algorithm as a proposed method. The findings of the study show that the approximation function model for each type of GFPP was a nonlinear-power function. The three performance criteria were evaluated. GTCC and CCPP have better performance criteria than GEPP due to more data sets. However, the results can be applied as one reference for budgeting or planning purposes and are not recommended for detailed estimation in procurement or project execution due to the low definition of project.
印尼燃气电厂成本逼近模型的非线性最小二乘与演化相结合方法
工程造价估算是整个工程规划活动的关键阶段之一。它涉及到在这个项目上要花多少钱。天然气作为最清洁的化石燃料,在国内能源中具有战略地位。因此,燃气发电厂(GFPPs),包括燃气轮机发电厂(GTPP),燃气发动机发电厂(GEPP)和联合循环发电厂(CCPP),仍然有希望满足电力需求。此外,可再生能源的增长仍然很低。由于缺乏对项目成本估算和现有项目成本数据库的了解,已经开始通过数学模型寻找项目成本近似值。该研究旨在根据现有合同项目或原始设备制造商(OEM)的数据集,概述印度尼西亚几种类型的gfpp项目成本估算。提出了一种结合非线性最小二乘和进化算法的ggfpp成本估算方法。研究结果表明,各类型gfp的近似函数模型均为非线性幂函数。对三个性能标准进行了评价。由于数据集较多,GTCC和CCPP比GEPP具有更好的性能标准。然而,这些结果可以作为预算或规划目的的参考,由于项目的定义较低,不建议用于采购或项目执行中的详细估计。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 求助全文
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信