CRITICAL SUCCESS FACTORS FOR MODULAR CONSTRUCTION ON HIGH-RISE RESIDENTIAL BUILDINGS BASED RISK MANAGEABILITY TO INCREASE PROJECT TIME PERFORMANCE

D. Aulia, Vian Marantha Haryanto, A. B. Waseso, Endarmadi Aji Prayitno, M. M. Sampetoding
{"title":"CRITICAL SUCCESS FACTORS FOR MODULAR CONSTRUCTION ON HIGH-RISE RESIDENTIAL BUILDINGS BASED RISK MANAGEABILITY TO INCREASE PROJECT TIME PERFORMANCE","authors":"D. Aulia, Vian Marantha Haryanto, A. B. Waseso, Endarmadi Aji Prayitno, M. M. Sampetoding","doi":"10.25105/urbanenvirotech.v6i2.13826","DOIUrl":null,"url":null,"abstract":"International Construction Costs published in Comparison 2020 continued to increase as an impact of the Covid-19 pandemic, The modular system is considered able to answer the problems of increasing costs. Although modular construction has been widely applied to low-rise buildings, application in high-rise buildings remains limited, less than 1% worldwide. The need for residential high-rise building applying modular construction in Indonesia becomes important. The interdependence between parties in modular projects is greater than in conventional methods. Unavailability of design guidelines hinders the construction industry in implementing modular technology. The purpose of this study is to analyze the critical success factors for modular construction of residential high-rise buildings applying risk-based management to improve project time performance. Forty-one Indicators were drawn from literature reviews and specialist interviews to conduct a sustainability evaluation. The survey was submitted to case project developers, designers, supervisors, and contractors in Indonesia, thereafter statistically analyzed using SPSS and risk management analysis with three stages: risk sources, risk drivers and risk causes. Critical success factors for drawing approvals have a considerable influence on modular construction among 15 other factors, followed by supply chain and design standardization. It is necessary to mitigate these risks to improve project time performance.","PeriodicalId":329428,"journal":{"name":"INDONESIAN JOURNAL OF URBAN AND ENVIRONMENTAL TECHNOLOGY","volume":"70 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2023-08-30","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"INDONESIAN JOURNAL OF URBAN AND ENVIRONMENTAL TECHNOLOGY","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.25105/urbanenvirotech.v6i2.13826","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

Abstract

International Construction Costs published in Comparison 2020 continued to increase as an impact of the Covid-19 pandemic, The modular system is considered able to answer the problems of increasing costs. Although modular construction has been widely applied to low-rise buildings, application in high-rise buildings remains limited, less than 1% worldwide. The need for residential high-rise building applying modular construction in Indonesia becomes important. The interdependence between parties in modular projects is greater than in conventional methods. Unavailability of design guidelines hinders the construction industry in implementing modular technology. The purpose of this study is to analyze the critical success factors for modular construction of residential high-rise buildings applying risk-based management to improve project time performance. Forty-one Indicators were drawn from literature reviews and specialist interviews to conduct a sustainability evaluation. The survey was submitted to case project developers, designers, supervisors, and contractors in Indonesia, thereafter statistically analyzed using SPSS and risk management analysis with three stages: risk sources, risk drivers and risk causes. Critical success factors for drawing approvals have a considerable influence on modular construction among 15 other factors, followed by supply chain and design standardization. It is necessary to mitigate these risks to improve project time performance.
基于风险管理的高层住宅模块化施工的关键成功因素,以提高项目的时间绩效
在2019冠状病毒病大流行的影响下,《比较2020》公布的国际建筑成本继续增加,模块化系统被认为能够解决成本增加的问题。虽然模块化建筑在低层建筑中得到了广泛的应用,但在高层建筑中的应用仍然有限,在世界范围内还不到1%。在印度尼西亚,应用模块化结构的高层住宅建筑的需求变得非常重要。模块化项目中各方之间的相互依赖比传统方法更大。设计指南的缺乏阻碍了建筑行业实施模块化技术。本研究的目的是分析住宅高层建筑模块化施工的关键成功因素,运用风险管理来提高项目的时间绩效。从文献综述和专家访谈中得出41个指标,以进行可持续性评价。将调查问卷提交给印度尼西亚的案例项目开发商、设计师、主管和承包商,然后使用SPSS和风险管理分析进行统计分析,分为风险源、风险驱动因素和风险原因三个阶段。图纸批准的关键成功因素在其他15个因素中对模块化结构有相当大的影响,其次是供应链和设计标准化。减轻这些风险以改善项目时间绩效是必要的。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 求助全文
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信