{"title":"Mixed-Integer-Quadratic-Programming based Predictive Control for hydrogen production using renewable energy","authors":"A. Serna, F. Tadeo, J. Normey-Rico","doi":"10.1109/IREC.2016.7478890","DOIUrl":null,"url":null,"abstract":"An Energy Management System (EMS) to balance the production of renewable sources with the consumption by a set of electrolization units is proposed here based on Model Predictive Control ideas (MPC). This EMS regulates the operating point of each electrolyzer and its connections or disconnections using a Mixed-Integer-Quadratic-Programming algorithm. A case study is given for an installation composed of wave and wind energy sources and a set of 3 alkaline electrolyzers. Validation using measured data at the target location of the installation shows the adequate performance of the proposed EMS.","PeriodicalId":190533,"journal":{"name":"2016 7th International Renewable Energy Congress (IREC)","volume":"427 7","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2016-03-22","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"2","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"2016 7th International Renewable Energy Congress (IREC)","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/IREC.2016.7478890","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 2
Abstract
An Energy Management System (EMS) to balance the production of renewable sources with the consumption by a set of electrolization units is proposed here based on Model Predictive Control ideas (MPC). This EMS regulates the operating point of each electrolyzer and its connections or disconnections using a Mixed-Integer-Quadratic-Programming algorithm. A case study is given for an installation composed of wave and wind energy sources and a set of 3 alkaline electrolyzers. Validation using measured data at the target location of the installation shows the adequate performance of the proposed EMS.