Addressing Design and Construction Challenges for a Complex Elevated Interchange over the Sea

M. Tapley, Lemuel Leung, P. Chan
{"title":"Addressing Design and Construction Challenges for a Complex Elevated Interchange over the Sea","authors":"M. Tapley, Lemuel Leung, P. Chan","doi":"10.2749/prague.2022.1535","DOIUrl":null,"url":null,"abstract":"As part of the strategic road network in Hong Kong, an express link will connect East Kowloon and the new town of Tseung Kwan O. Part of this link includes an elevated interchange over the sea with seven post- tensioned bridges. The series of balanced cantilever bridges within this marine interchange run in a spaghetti junction manner around the main line viaduct, which comprises two parallel bridges connected at each pier with a cast in-situ diaphragm.This paper presents the project’s unprecedented design challenges, along with the methods used to construct the complex viaducts whilst ensuring a safe construction environment.","PeriodicalId":168532,"journal":{"name":"IABSE Symposium, Prague 2022: Challenges for Existing and Oncoming Structures","volume":"43 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"1900-01-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"IABSE Symposium, Prague 2022: Challenges for Existing and Oncoming Structures","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.2749/prague.2022.1535","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

Abstract

As part of the strategic road network in Hong Kong, an express link will connect East Kowloon and the new town of Tseung Kwan O. Part of this link includes an elevated interchange over the sea with seven post- tensioned bridges. The series of balanced cantilever bridges within this marine interchange run in a spaghetti junction manner around the main line viaduct, which comprises two parallel bridges connected at each pier with a cast in-situ diaphragm.This paper presents the project’s unprecedented design challenges, along with the methods used to construct the complex viaducts whilst ensuring a safe construction environment.
解决海上复杂高架立交的设计和施工挑战
作为香港策略性道路网络的一部分,一条连接东九龙和将军澳新市镇的快速通道将会落成。这条通道的部分路段包括一个由七座后张式桥梁组成的跨海高架立交。海洋立交内的一系列平衡悬臂桥围绕主线高架桥以意大利面式连接方式运行,主干线高架桥由两座平行的桥梁组成,每个桥墩由现浇膜片连接。本文介绍了该项目前所未有的设计挑战,以及在确保安全施工环境的同时建造复杂高架桥的方法。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 求助全文
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:604180095
Book学术官方微信