{"title":"NextGen plans, progress and partnerships with the user community: Safety/regulatory aspects","authors":"Lou Volchansky","doi":"10.1109/ICNSURV.2011.5935410","DOIUrl":null,"url":null,"abstract":"• Develop performance-based standards to accommodate flexibility in implementation — Challenge: incorporate new technologies at different levels of maturity — Accelerate standards development phase to manage approvals phase • AVS Work Plan outlines commitment to NextGen — Supports “enabler” concept of NextGen Implementation Plan — Continue policy and streamlining initiatives designed to speed installation","PeriodicalId":263977,"journal":{"name":"2011 Integrated Communications, Navigation, and Surveillance Conference Proceedings","volume":"9 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2011-05-10","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"2011 Integrated Communications, Navigation, and Surveillance Conference Proceedings","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/ICNSURV.2011.5935410","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0
Abstract
• Develop performance-based standards to accommodate flexibility in implementation — Challenge: incorporate new technologies at different levels of maturity — Accelerate standards development phase to manage approvals phase • AVS Work Plan outlines commitment to NextGen — Supports “enabler” concept of NextGen Implementation Plan — Continue policy and streamlining initiatives designed to speed installation