{"title":"Site Reports: Geomechanics and Tunneling 2/2020","authors":"","doi":"10.1002/geot.202070206","DOIUrl":null,"url":null,"abstract":"Efficient connection from Munich to Garmisch‐Partenkirchen: The new Oberau Tunnel / Effiziente Verbindung von München nach Garmisch‐Partenkirchen: Der neue Tunnel Oberau","PeriodicalId":170042,"journal":{"name":"Geomechanics and Tunnelling","volume":"62 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2020-04-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Geomechanics and Tunnelling","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1002/geot.202070206","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0
Abstract
Efficient connection from Munich to Garmisch‐Partenkirchen: The new Oberau Tunnel / Effiziente Verbindung von München nach Garmisch‐Partenkirchen: Der neue Tunnel Oberau