Bending Metal: Improving Sheet Metal Repair at Tobyhanna Army Depot through Lean Six Sigma

James R. Enos, Abigail Burris, Liam M. Caulfield, Robert DeYoung, S.-C. Houng, Christopher Kubitz
{"title":"Bending Metal: Improving Sheet Metal Repair at Tobyhanna Army Depot through Lean Six Sigma","authors":"James R. Enos, Abigail Burris, Liam M. Caulfield, Robert DeYoung, S.-C. Houng, Christopher Kubitz","doi":"10.37266/iser.2021v9i2.pp99-109","DOIUrl":null,"url":null,"abstract":"The Army's Lean Six Sigma methodology includes five phases: Define, Measure, Analyze, Improve, and Control (DMAIC); each of these phases includes interaction between the stakeholder and process team. This paper focuses on the application of Lean Six Sigma methodology at Tobyhanna Army Depot to help reduce overruns and repair cycle time within the sheet metal cost center. At the initiation of the project, the process incurred over 4,000 hours of overruns, a situation in which it takes longer to repair an asset than the standard hours allocated for the repair. Additionally, the average repair cycle time, amount of time required to repair an individual asset, exceeded customer expectations by almost four days. The paper describes recommended solutions to address both problems.","PeriodicalId":349010,"journal":{"name":"Industrial and Systems Engineering Review","volume":"29 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2022-01-15","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Industrial and Systems Engineering Review","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.37266/iser.2021v9i2.pp99-109","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

Abstract

The Army's Lean Six Sigma methodology includes five phases: Define, Measure, Analyze, Improve, and Control (DMAIC); each of these phases includes interaction between the stakeholder and process team. This paper focuses on the application of Lean Six Sigma methodology at Tobyhanna Army Depot to help reduce overruns and repair cycle time within the sheet metal cost center. At the initiation of the project, the process incurred over 4,000 hours of overruns, a situation in which it takes longer to repair an asset than the standard hours allocated for the repair. Additionally, the average repair cycle time, amount of time required to repair an individual asset, exceeded customer expectations by almost four days. The paper describes recommended solutions to address both problems.
弯曲金属:通过精益六西格玛改进Tobyhanna陆军仓库的钣金修复
陆军精益六西格玛方法包括五个阶段:定义、测量、分析、改进和控制(DMAIC);每个阶段都包括涉众和过程团队之间的交互。本文重点介绍了精益六西格玛方法在Tobyhanna陆军仓库的应用,以帮助减少钣金成本中心的超支和维修周期时间。在项目开始时,该过程产生了超过4,000小时的超支,在这种情况下,修复资产所需的时间比分配给修复的标准时间要长。此外,平均维修周期,即修复单个资产所需的时间,几乎超出了客户的预期4天。本文介绍了解决这两个问题的建议解决方案。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 求助全文
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:604180095
Book学术官方微信