Hydrological Analysis of Kadumalik Reservoir Design To Fulfill Water Demands of the Plan In the Cilutung IA (Irrigation Area)

Utamy Sukmayu Sanutri, Y. Suharnoto, A. Sapei, Cece Suhendi
{"title":"Hydrological Analysis of Kadumalik Reservoir Design To Fulfill Water Demands of the Plan In the Cilutung IA (Irrigation Area)","authors":"Utamy Sukmayu Sanutri, Y. Suharnoto, A. Sapei, Cece Suhendi","doi":"10.1109/ICCED51276.2020.9415848","DOIUrl":null,"url":null,"abstract":"The Kamun Irrigation Area or formerly better known as the Cilutung Irrigation Area (West and East) covering an area of 8,642 ha utilizing water from the Cilutung River through the Kamun Dam. At present, the intensity of planting in IA (irrigation area)at Kamun reaches only 211% with the main cropping pattern being rice-rice-crops. When looking at the potential availability of water in Kamun Dam, the amount of cumulative water availability per year (1,165 million m3 / year) still far exceeds the total irrigation water needs of Kamun IA (299 million m3 / year). The water balance deficit in Kamun Dam occurred in the period from the end of May to the end of November. The solution to overcome the fluctuations in water availability that is not in line with the fluctuations in water needs, namely by building reservoirs that that have one of the potential in Kadumalik. With the Kadumalik Reservoir it is expected that cropping intensity can increase by 300%. Based on the results of the hydrological analysis, the construction of the Kadumalik Reservoir in the Cilutung watershed can have a significant impact on the supply of irrigation water and raw water requirements. In addition, as a reduction in flooding downstream of the dam by 37.6% (when 20 years return). Kadumalik Reservoir has a reservoir capacity of 35.67 million m3 which can be used to irrigate an area of 8,462 Ha. Irrigation water needs with the pattern of planting rice-rice-crops, the amount of irrigation water needs is 2.5 m3 / sec. The Kadumalik Dam is also planned to meet the raw water in Majalengka and Cirebon Regencies with the amount of water needed for MRI (Master Requirement Plan) is 4.5 m3 / sec.","PeriodicalId":344981,"journal":{"name":"2020 6th International Conference on Computing Engineering and Design (ICCED)","volume":"13 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2020-10-15","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"1","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"2020 6th International Conference on Computing Engineering and Design (ICCED)","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/ICCED51276.2020.9415848","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 1

Abstract

The Kamun Irrigation Area or formerly better known as the Cilutung Irrigation Area (West and East) covering an area of 8,642 ha utilizing water from the Cilutung River through the Kamun Dam. At present, the intensity of planting in IA (irrigation area)at Kamun reaches only 211% with the main cropping pattern being rice-rice-crops. When looking at the potential availability of water in Kamun Dam, the amount of cumulative water availability per year (1,165 million m3 / year) still far exceeds the total irrigation water needs of Kamun IA (299 million m3 / year). The water balance deficit in Kamun Dam occurred in the period from the end of May to the end of November. The solution to overcome the fluctuations in water availability that is not in line with the fluctuations in water needs, namely by building reservoirs that that have one of the potential in Kadumalik. With the Kadumalik Reservoir it is expected that cropping intensity can increase by 300%. Based on the results of the hydrological analysis, the construction of the Kadumalik Reservoir in the Cilutung watershed can have a significant impact on the supply of irrigation water and raw water requirements. In addition, as a reduction in flooding downstream of the dam by 37.6% (when 20 years return). Kadumalik Reservoir has a reservoir capacity of 35.67 million m3 which can be used to irrigate an area of 8,462 Ha. Irrigation water needs with the pattern of planting rice-rice-crops, the amount of irrigation water needs is 2.5 m3 / sec. The Kadumalik Dam is also planned to meet the raw water in Majalengka and Cirebon Regencies with the amount of water needed for MRI (Master Requirement Plan) is 4.5 m3 / sec.
吉鲁东灌区卡杜马力克水库满足规划需水量的水文分析
卡蒙灌区或以前更好地称为吉卢东灌区(西部和东部),占地8,642公顷,利用吉卢东河通过卡蒙大坝的水。目前,卡蒙灌区的种植强度仅为211%,主要种植模式为水稻-水稻-作物。从卡蒙大坝的潜在可用水量来看,每年的累计可用水量(11.65亿立方米/年)仍然远远超过卡蒙水电站的灌溉总需水量(2.99亿立方米/年)。卡蒙大坝的水平衡亏缺发生在5月底至11月底。克服与水需求波动不一致的可得水量波动的解决办法是,在Kadumalik建造具有潜力的水库。有了Kadumalik水库,预计种植强度可以增加300%。根据水文分析结果,在Cilutung流域修建Kadumalik水库对灌溉用水和原水需求的供应会产生重大影响。此外,大坝下游的洪水减少了37.6%(当20年返回时)。Kadumalik水库的库容为3567万立方米,可用于灌溉8,462公顷的面积。灌溉需水量为水稻-水稻-作物种植模式,灌溉需水量为2.5 m3 /秒。卡杜马力克大坝还计划满足马雅伦卡和希勒本地区的原水,MRI(总需求计划)需水量为4.5 m3 /秒。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 求助全文
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信