{"title":"THE EFFECT OF EXCESSIVE SETTING TIME, LONG DAMAGE OF THE MACHINE, TIME OF PACKAGING PACKAGES STOPPED TO PRODUCTION OPERATIONAL COSTS: STUDY IN LINE 8A PT XYZ FARMA Tbk","authors":"A. A. N. Dipajana, H. IhaHaryani","doi":"10.48024/ijgame2.v1i1.8","DOIUrl":null,"url":null,"abstract":"This study aims to determine the effect of excess machine setting time, machine breakdown time, time for packaging lines to stop, on production operating costs and which factors are most dominant in influencing production operating costs. This research uses a quantitative descriptive method approach. The place of research is at PT. XYZ Farma on line 8A. The research sample consisted of 22 data records from a population of 450 data records. Data collection techniques are observation techniques, event recording and documentation. The results showed the influence of excessive setting time, machine damage time, packaging line time stalled against operational costs of production. This is demonstrated by using AMOS, the value of C.R (Critical Ratio) exceeds the critical value ± 1,717. The value of C.R for each variable is the excessive machine setting time, the length of time the machine is damaged, and the time of the packaging line has stalled towards the operational cost of production is 2,850; 10, 913; 5,330. \nBased on AMOS Standardized Regression Weight Output statistical calculations show that the duration of damage to the machine provides the greatest contribution in increasing the operational costs of production. This is indicated by the estimated coefficient value of the largest engine damage time which is 82.1%. So it can be concluded that the influence of excess engine setting time, machine breakdown time and time of the packaging line has stalled to the operational costs of production with the variable length of engine damage giving the greatest contribution.","PeriodicalId":407829,"journal":{"name":"International Journal of Global Accounting, Management, Education, and Entrepreneurship","volume":"222 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2020-06-25","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"1","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"International Journal of Global Accounting, Management, Education, and Entrepreneurship","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.48024/ijgame2.v1i1.8","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 1

Abstract

This study aims to determine the effect of excess machine setting time, machine breakdown time, time for packaging lines to stop, on production operating costs and which factors are most dominant in influencing production operating costs. This research uses a quantitative descriptive method approach. The place of research is at PT. XYZ Farma on line 8A. The research sample consisted of 22 data records from a population of 450 data records. Data collection techniques are observation techniques, event recording and documentation. The results showed the influence of excessive setting time, machine damage time, packaging line time stalled against operational costs of production. This is demonstrated by using AMOS, the value of C.R (Critical Ratio) exceeds the critical value ± 1,717. The value of C.R for each variable is the excessive machine setting time, the length of time the machine is damaged, and the time of the packaging line has stalled towards the operational cost of production is 2,850; 10, 913; 5,330. Based on AMOS Standardized Regression Weight Output statistical calculations show that the duration of damage to the machine provides the greatest contribution in increasing the operational costs of production. This is indicated by the estimated coefficient value of the largest engine damage time which is 82.1%. So it can be concluded that the influence of excess engine setting time, machine breakdown time and time of the packaging line has stalled to the operational costs of production with the variable length of engine damage giving the greatest contribution.
固定时间过长、机器损坏时间过长、包装时间过长对生产运行成本的影响:XYZ农场Tbk生产线8A的研究
本研究的目的是确定多余的机器设置时间、机器故障时间、包装线停止时间对生产运行成本的影响,以及哪些因素对生产运行成本的影响最主要。本研究采用定量描述方法。研究地点在8A线上的XYZ农场。研究样本由450个数据记录中的22个数据记录组成。数据收集技术包括观察技术、事件记录和文档。结果表明,凝固时间过长、机器损坏时间过长、包装线停顿时间过长对生产运行成本的影响。用AMOS计算表明,C.R (Critical Ratio)的值超过了临界值±1717。每个变量的C.R值为机器设置时间过长,机器损坏的时间长度,包装线停滞的时间朝向生产的运行成本为2850;10, 913;5330年。基于AMOS标准化回归权重输出统计计算表明,机器损坏的持续时间对增加生产的运营成本贡献最大。发动机最大损伤时间的估计系数值为82.1%。由此可以得出,发动机过量定型时间、机器故障时间和包装线时间对生产运行成本的影响已经停滞,其中发动机损伤变长贡献最大。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 求助全文
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:604180095
Book学术官方微信