{"title":"Excelling in Subsurface Unscheduled Deferment: Showcasing Best-In-Class Performance in Field X in the Southern of Oman","authors":"Ghosin Nasser Al Shukaili, Ahmed Al Ajmi, S. Al Kindi, Said Nasser Al Riyami, Saif Mohammed Al Matroushi, Mehdi Mohamed Al Lawati, G. Urdaneta, Marpaung Billman Morinata","doi":"10.2118/214005-ms","DOIUrl":null,"url":null,"abstract":"\n One of PDO operated field in southern Oman (Field X) was seeing an increase with time in subsurface unscheduled deferment reaching 3.7% of total field potential in 2020. This percentage of subsurface unscheduled deferment was far away from local (2%) and global (1%) top quartile.\n Field X considered is one of the oldest fields in southern Oman and currently producing over 90 K bbl/d of net oil from over 2200 oil producers, distributed across 23 fields. The oil is being processed by 5 main stations. Very dynamic operation taking place in Filed X with more than 1600 well interventions yearly. Due to these facts, Subsurface unscheduled deferment management in Field X is a real challenge. And If this business pain not resolved, an average of 3,800 bbl/d unscheduled sub-surface deferment will continue and accumulate.\n In a phase-wise approach, a dedicated workshop on subsurface deferment reduction was carried out with all the stakeholders in 2020 to reach the potential solutions to reduce unplanned subsurface deferment in Field X. The four main elements for this pain are Fail Less, Restoration cycle time, resources management and data visualization.\n Since 2020 Field X subsurface unscheduled deferment has been decreasing dramatically to 2.9% in 2021 and 2.4% in 2022, approaching local top quartile (2%). A historical record has been achieved in September 2022 by reducing the unscheduled subsurface deferment to only 0.8% beating both local and global (1%) top quartile. This paper will discuss the methodology and best practices that led to achieve such results.","PeriodicalId":286390,"journal":{"name":"Day 1 Mon, March 13, 2023","volume":"429 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2023-03-13","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Day 1 Mon, March 13, 2023","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.2118/214005-ms","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

Abstract

One of PDO operated field in southern Oman (Field X) was seeing an increase with time in subsurface unscheduled deferment reaching 3.7% of total field potential in 2020. This percentage of subsurface unscheduled deferment was far away from local (2%) and global (1%) top quartile. Field X considered is one of the oldest fields in southern Oman and currently producing over 90 K bbl/d of net oil from over 2200 oil producers, distributed across 23 fields. The oil is being processed by 5 main stations. Very dynamic operation taking place in Filed X with more than 1600 well interventions yearly. Due to these facts, Subsurface unscheduled deferment management in Field X is a real challenge. And If this business pain not resolved, an average of 3,800 bbl/d unscheduled sub-surface deferment will continue and accumulate. In a phase-wise approach, a dedicated workshop on subsurface deferment reduction was carried out with all the stakeholders in 2020 to reach the potential solutions to reduce unplanned subsurface deferment in Field X. The four main elements for this pain are Fail Less, Restoration cycle time, resources management and data visualization. Since 2020 Field X subsurface unscheduled deferment has been decreasing dramatically to 2.9% in 2021 and 2.4% in 2022, approaching local top quartile (2%). A historical record has been achieved in September 2022 by reducing the unscheduled subsurface deferment to only 0.8% beating both local and global (1%) top quartile. This paper will discuss the methodology and best practices that led to achieve such results.
在地下非计划延期方面表现出色:在阿曼南部的X油田展示了一流的性能
PDO在阿曼南部运营的一个油田(field X),随着地下计划外延期时间的增加,到2020年将达到油田总潜力的3.7%。这一地下计划外延迟的百分比远低于当地(2%)和全球(1%)的前四分之一。X油田被认为是阿曼南部最古老的油田之一,目前来自22个油田的2200多个石油生产商的净产油量超过9万桶/天。石油由5个主要油站处理。X油田的作业非常动态,每年有1600多口井进行干预。由于这些事实,X油田的地下非计划延期管理是一个真正的挑战。如果这一问题得不到解决,平均3800桶/天的计划外地下延迟将继续积累。在分阶段的方法中,在2020年与所有利益相关者一起开展了一次关于减少地下延迟的专门研讨会,以达成减少x油田意外地下延迟的潜在解决方案。这一痛苦的四个主要要素是减少故障、恢复周期时间、资源管理和数据可视化。自2020年以来,X油田的地下计划外延期率大幅下降,2021年降至2.9%,2022年降至2.4%,接近当地最高的四分之一(2%)。2022年9月,该公司将计划外的地下延迟减少到0.8%,创下了历史记录,超过了当地和全球的前四分之一(1%)。本文将讨论导致实现这些结果的方法和最佳实践。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 求助全文
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:604180095
Book学术官方微信