Early cost estimation of software reworks using fuzzy requirement-based model

T. A. Khalid, E. Yeoh
{"title":"Early cost estimation of software reworks using fuzzy requirement-based model","authors":"T. A. Khalid, E. Yeoh","doi":"10.1109/ICCCCEE.2017.7866082","DOIUrl":null,"url":null,"abstract":"Defects uncovered during software testing usually consume a considerable amount of the overall project's budget. Unfortunately, project managers are not well-equipped with techniques to estimate such cost overrun. Moreover, incorporating defects removal process as part of the software testing activities has made the project managers overlook this important cost component during their planning processes. This paper suggested a fuzzy model to estimate the cost of defects removal at the early stages of project planning in terms of the project's functional size and the experience of the development team. The suggested model is supposed to enhance the accuracy of the software project cost estimation.","PeriodicalId":227798,"journal":{"name":"2017 International Conference on Communication, Control, Computing and Electronics Engineering (ICCCCEE)","volume":"88 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"1900-01-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"7","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"2017 International Conference on Communication, Control, Computing and Electronics Engineering (ICCCCEE)","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/ICCCCEE.2017.7866082","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 7

Abstract

Defects uncovered during software testing usually consume a considerable amount of the overall project's budget. Unfortunately, project managers are not well-equipped with techniques to estimate such cost overrun. Moreover, incorporating defects removal process as part of the software testing activities has made the project managers overlook this important cost component during their planning processes. This paper suggested a fuzzy model to estimate the cost of defects removal at the early stages of project planning in terms of the project's functional size and the experience of the development team. The suggested model is supposed to enhance the accuracy of the software project cost estimation.
基于模糊需求模型的软件返工早期成本估算
在软件测试期间发现的缺陷通常会消耗整个项目预算的相当一部分。不幸的是,项目经理并没有很好地配备估算这种成本超支的技术。此外,将缺陷移除过程作为软件测试活动的一部分,使得项目经理在他们的计划过程中忽略了这个重要的成本组成部分。本文提出了一个模糊模型,根据项目的功能大小和开发团队的经验,在项目计划的早期阶段估计缺陷移除的成本。该模型旨在提高软件项目成本估算的准确性。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 求助全文
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信