Availability target of the railway infrastructure: an analysis

A. P. Patra, U. Kumar, Per-Olof Larsson Kråik
{"title":"Availability target of the railway infrastructure: an analysis","authors":"A. P. Patra, U. Kumar, Per-Olof Larsson Kråik","doi":"10.1109/RAMS.2010.5448035","DOIUrl":null,"url":null,"abstract":"The railway has been accepted as one of the most environmentally friendly modes of transport for goods and passengers. However, the railway sector is striving to increase its capacity to meet the growing demand for the transport of goods and passengers with a high level of punctuality in its services. Higher availability requires the effective operation and maintenance of infrastructure, often necessitating the implementation of cost-effective preventive maintenance strategies. Therefore, a higher availability target means higher maintenance investment. However, the question of setting the availability target for the infrastructure is not easy, as it involves many influencing decision parameters, apart from a good understanding of the network configuration and traffic density. Railway networks that have a smaller number of trains and a low punctuality requirement do not require higher availability targets. The aim of this paper is to estimate the availability target for railway infrastructure based on the capacity and punctuality requirements of infrastructure managers and train operating companies. The objectives of the paper are to develop an approach to i) estimating the capacity of the infrastructure based on the design and operational characteristics and evaluating the influence of infrastructure availability on the required capacity and ii) estimating the volume of primary and secondary delay due to failures and maintenance of the infrastructure and establishing the relationship between availability and punctuality requirements. To achieve these objectives, an example is presented with parameters drawn from failure, maintenance and traffic data. Finally, a model has been developed in Petri-Nets to establish a relationship between availability, capacity and punctuality. Monte Carlo simulation is used to establish the relationship. The simulation results illustrate the effect of infrastructure availability on train delays and capacity.","PeriodicalId":299782,"journal":{"name":"2010 Proceedings - Annual Reliability and Maintainability Symposium (RAMS)","volume":"11 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"1900-01-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"13","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"2010 Proceedings - Annual Reliability and Maintainability Symposium (RAMS)","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/RAMS.2010.5448035","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 13

Abstract

The railway has been accepted as one of the most environmentally friendly modes of transport for goods and passengers. However, the railway sector is striving to increase its capacity to meet the growing demand for the transport of goods and passengers with a high level of punctuality in its services. Higher availability requires the effective operation and maintenance of infrastructure, often necessitating the implementation of cost-effective preventive maintenance strategies. Therefore, a higher availability target means higher maintenance investment. However, the question of setting the availability target for the infrastructure is not easy, as it involves many influencing decision parameters, apart from a good understanding of the network configuration and traffic density. Railway networks that have a smaller number of trains and a low punctuality requirement do not require higher availability targets. The aim of this paper is to estimate the availability target for railway infrastructure based on the capacity and punctuality requirements of infrastructure managers and train operating companies. The objectives of the paper are to develop an approach to i) estimating the capacity of the infrastructure based on the design and operational characteristics and evaluating the influence of infrastructure availability on the required capacity and ii) estimating the volume of primary and secondary delay due to failures and maintenance of the infrastructure and establishing the relationship between availability and punctuality requirements. To achieve these objectives, an example is presented with parameters drawn from failure, maintenance and traffic data. Finally, a model has been developed in Petri-Nets to establish a relationship between availability, capacity and punctuality. Monte Carlo simulation is used to establish the relationship. The simulation results illustrate the effect of infrastructure availability on train delays and capacity.
铁路基础设施可用性目标分析
铁路已被公认为最环保的货物和乘客运输方式之一。然而,铁路部门正在努力提高其运力,以满足日益增长的货物和旅客运输需求,并提供高水平的准时服务。更高的可用性要求对基础设施进行有效的操作和维护,通常需要实施具有成本效益的预防性维护战略。因此,更高的可用性目标意味着更高的维护投资。然而,为基础设施设置可用性目标的问题并不容易,因为除了对网络配置和流量密度的良好理解之外,它还涉及许多影响决策的参数。列车数量较少且准点要求较低的铁路网不需要更高的可用性目标。本文的目的是根据基础设施管理者和列车运营公司的运力和准点率要求来估计铁路基础设施的可用性目标。本文的目标是开发一种方法,以i)根据设计和运行特征估计基础设施的容量,并评估基础设施可用性对所需容量的影响;ii)估计由于基础设施故障和维护造成的主要和次要延迟的数量,并建立可用性和准时性要求之间的关系。为了实现这些目标,给出了一个从故障、维护和交通数据中提取参数的例子。最后,Petri-Nets开发了一个模型,以建立可用性、能力和准时性之间的关系。利用蒙特卡罗模拟建立了二者之间的关系。仿真结果说明了基础设施可用性对列车延误和运力的影响。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 求助全文
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信