{"title":"Total Productive Maintenance Implementation's Barriers and Enablers in Indonesian Manufacturing Companies","authors":"H. Prabowo, I. Hilmy, Erry Yulian Triblas Adesta","doi":"10.1109/ASET48392.2020.9118224","DOIUrl":null,"url":null,"abstract":"Nowadays, Corporate is implementing Total Productive Maintenance (TPM) in order to survive in a very challenging and competitive market. If they want to survive, the have to maintain and even increase their equipment efficiency. However, the TPM utilization is a relatively difficult activity. Some obstacles as well as the supporting factors will determine the speed of the implementation process. Identifying and analyzing those obstacles and supporting factor are very important steps to gain an effective utilization of the TPM. The main discussion of this research is to acquire the significant barriers and enablers of TPM implementation in Indonesian manufacturing companies using Cochran test analysis. In this report, these barriers and enablers have been determined through the literature; data collecting is done by a questionnaire-based survey. There are five significant enablers and seven barriers affecting the achievement rate of TPM.","PeriodicalId":237887,"journal":{"name":"2020 Advances in Science and Engineering Technology International Conferences (ASET)","volume":"77 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2020-02-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"2","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"2020 Advances in Science and Engineering Technology International Conferences (ASET)","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/ASET48392.2020.9118224","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 2

Abstract

Nowadays, Corporate is implementing Total Productive Maintenance (TPM) in order to survive in a very challenging and competitive market. If they want to survive, the have to maintain and even increase their equipment efficiency. However, the TPM utilization is a relatively difficult activity. Some obstacles as well as the supporting factors will determine the speed of the implementation process. Identifying and analyzing those obstacles and supporting factor are very important steps to gain an effective utilization of the TPM. The main discussion of this research is to acquire the significant barriers and enablers of TPM implementation in Indonesian manufacturing companies using Cochran test analysis. In this report, these barriers and enablers have been determined through the literature; data collecting is done by a questionnaire-based survey. There are five significant enablers and seven barriers affecting the achievement rate of TPM.
印尼制造企业全面生产维护实施的障碍与推动因素
当今,企业为了在充满挑战和竞争的市场中生存,正在实施全面生产维护(TPM)。如果他们想要生存,就必须保持甚至提高设备的效率。然而,TPM的利用是一个相对困难的活动。一些障碍和辅助因素将决定执行进程的速度。识别和分析这些障碍和支持因素是有效利用TPM的重要步骤。本研究的主要讨论是利用科克伦测试分析获得印尼制造公司实施TPM的重大障碍和推动因素。在本报告中,通过文献确定了这些障碍和推动因素;数据收集是通过问卷调查完成的。影响TPM成活率的主要因素有5个,障碍有7个。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 求助全文
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信