A Software Project Risk Analysis Model Based on Evidential Reasoning Approach

Nan Feng, Minqiang Li, H. Gao
{"title":"A Software Project Risk Analysis Model Based on Evidential Reasoning Approach","authors":"Nan Feng, Minqiang Li, H. Gao","doi":"10.1109/WCSE.2009.228","DOIUrl":null,"url":null,"abstract":"In this paper, a software project risk analysis model based on evidential reasoning approach is presented. The modeling process consists of four phases: specification of the model structure, assessment of evidence strength, determination of software project risks, and risk monitoring and analysis. Using the changes of strength of evidences obtained from the process of software project development, the model can continually estimate the state of risk, and identify the sources of risk. The model provides a rigorous, structured manner to incorporate relevant software project risk factors and their interrelationships when estimating software project risks.","PeriodicalId":331155,"journal":{"name":"2009 WRI World Congress on Software Engineering","volume":"50 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2009-05-19","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"7","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"2009 WRI World Congress on Software Engineering","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/WCSE.2009.228","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 7

Abstract

In this paper, a software project risk analysis model based on evidential reasoning approach is presented. The modeling process consists of four phases: specification of the model structure, assessment of evidence strength, determination of software project risks, and risk monitoring and analysis. Using the changes of strength of evidences obtained from the process of software project development, the model can continually estimate the state of risk, and identify the sources of risk. The model provides a rigorous, structured manner to incorporate relevant software project risk factors and their interrelationships when estimating software project risks.
基于证据推理方法的软件项目风险分析模型
提出了一种基于证据推理方法的软件项目风险分析模型。建模过程包括四个阶段:模型结构的说明、证据强度的评估、软件项目风险的确定以及风险监控和分析。利用从软件项目开发过程中获得的证据强度的变化,该模型可以持续地估计风险的状态,识别风险的来源。在评估软件项目风险时,该模型提供了一种严格的、结构化的方式来合并相关的软件项目风险因素及其相互关系。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 求助全文
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信