{"title":"Energy management in hybrid systems coupling PV and electrical storage","authors":"M. Brignone, F. Delfino, F. Pampararo, R. Procopio, M. Rossi, L. Barillari","doi":"10.1109/IISA.2015.7388080","DOIUrl":null,"url":null,"abstract":"In this contribution the possible benefits of the integration of a storage system (ST) and a photovoltaic power plant (PV) are investigated by means of a Heuristic Rules System (HRS), used both for the determination of the optimal size of the components and for the power production scheduling. The HRS takes into account the well-known electrical constraints and aims at satisfying the electrical demand following a priority order (PV, ST, main grid). Experimental results in the case of four possible scenarios are presented and discussed.","PeriodicalId":433872,"journal":{"name":"2015 6th International Conference on Information, Intelligence, Systems and Applications (IISA)","volume":"119 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2015-07-06","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"2","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"2015 6th International Conference on Information, Intelligence, Systems and Applications (IISA)","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/IISA.2015.7388080","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 2
Abstract
In this contribution the possible benefits of the integration of a storage system (ST) and a photovoltaic power plant (PV) are investigated by means of a Heuristic Rules System (HRS), used both for the determination of the optimal size of the components and for the power production scheduling. The HRS takes into account the well-known electrical constraints and aims at satisfying the electrical demand following a priority order (PV, ST, main grid). Experimental results in the case of four possible scenarios are presented and discussed.