Governor control study at the time of a black start

K. Furukawa, A. Izena, T. Shimojo, K. Hirayama, N. Furukawa
{"title":"Governor control study at the time of a black start","authors":"K. Furukawa, A. Izena, T. Shimojo, K. Hirayama, N. Furukawa","doi":"10.1109/PES.2004.1373127","DOIUrl":null,"url":null,"abstract":"The power system of Kyushu Electric Power Company Inc. (KEPCO), whose size is about 19 GW, belongs to the Western Japan interconnected power system of 110 GW. Its grid system is made up of 500 and 220 kV transmission lines in a looped configuration. When the KEPCO power system falls into a blackout, it will be restored from a small-scale power system to the extent that it cannot be compared with its grid size (110 GW) usually operated. First some prespecified hydro-generators will be started and interconnected with each other, and then a load will be added step by step to configure a small-scale power system. The governor type of those hydro generators to be used for a black start will be a mixture of PID governors and PD governors (proportional control with transient droop). This work reports a frequency stability study for such a small-scale power system with hydro generators at the time of a black start.","PeriodicalId":236779,"journal":{"name":"IEEE Power Engineering Society General Meeting, 2004.","volume":"50 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2004-06-10","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"7","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"IEEE Power Engineering Society General Meeting, 2004.","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/PES.2004.1373127","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 7

Abstract

The power system of Kyushu Electric Power Company Inc. (KEPCO), whose size is about 19 GW, belongs to the Western Japan interconnected power system of 110 GW. Its grid system is made up of 500 and 220 kV transmission lines in a looped configuration. When the KEPCO power system falls into a blackout, it will be restored from a small-scale power system to the extent that it cannot be compared with its grid size (110 GW) usually operated. First some prespecified hydro-generators will be started and interconnected with each other, and then a load will be added step by step to configure a small-scale power system. The governor type of those hydro generators to be used for a black start will be a mixture of PID governors and PD governors (proportional control with transient droop). This work reports a frequency stability study for such a small-scale power system with hydro generators at the time of a black start.
调控研究在黑时开始
九州电力公司(KEPCO)的电力系统规模约为19吉瓦,属于日本西部110吉瓦的互联电力系统。其电网系统由500千伏和220千伏输电线路组成。韩电的电力系统一旦发生停电,将从无法与平时运行的电网规模(110吉瓦)相比的小规模电力系统恢复。首先启动一批预定的水轮发电机,并将它们相互连接,然后逐步增加负荷,配置一个小规模的电力系统。用于黑启动的水轮发电机的调速器类型将是PID调速器和PD调速器(具有瞬态下垂的比例控制)的混合。这项工作报告了在黑启动时这种小型水力发电机电力系统的频率稳定性研究。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 求助全文
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:604180095
Book学术官方微信