{"title":"Helicopter installation of fiberoptic groundwire on overhead lines","authors":"D. Mize","doi":"10.1109/TDCLLM.1993.316257","DOIUrl":null,"url":null,"abstract":"This paper pertains to the innovative use of contractor-provided helicopter-airborne services as a replacement for some of the conventional work methods that would typically have been used on an optical ground wire retrofit program.<<ETX>>","PeriodicalId":198668,"journal":{"name":"Proceedings of ESMO '93. IEEE 6th International Conference on Transmission and Distribution Construction and Live-Line Maintenance","volume":"21 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"1993-09-12","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"3","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Proceedings of ESMO '93. IEEE 6th International Conference on Transmission and Distribution Construction and Live-Line Maintenance","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/TDCLLM.1993.316257","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 3
Abstract
This paper pertains to the innovative use of contractor-provided helicopter-airborne services as a replacement for some of the conventional work methods that would typically have been used on an optical ground wire retrofit program.<>