Lower bounds on test resources for scheduled data flow graphs

I. Parulkar, S. Gupta, M. Breuer
{"title":"Lower bounds on test resources for scheduled data flow graphs","authors":"I. Parulkar, S. Gupta, M. Breuer","doi":"10.1145/240518.240545","DOIUrl":null,"url":null,"abstract":"Lower bound estimations of resources at various stages of high-level synthesis are essential to guide synthesis algorithms towards optimal solutions. In this paper we present lower bounds on the number of test resources (i.e. test pattern generators, signature analyzers and CBILBO registers) required to test a synthesized data path using built-in self-test (BIST). The estimations are performed on scheduled data flow graphs and provide a practical way of selecting or modifying module assignments and schedules such that the resulting synthesized data path requires a small number of test resources to test itself.","PeriodicalId":152966,"journal":{"name":"33rd Design Automation Conference Proceedings, 1996","volume":"38 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"1996-06-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"8","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"33rd Design Automation Conference Proceedings, 1996","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1145/240518.240545","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 8

Abstract

Lower bound estimations of resources at various stages of high-level synthesis are essential to guide synthesis algorithms towards optimal solutions. In this paper we present lower bounds on the number of test resources (i.e. test pattern generators, signature analyzers and CBILBO registers) required to test a synthesized data path using built-in self-test (BIST). The estimations are performed on scheduled data flow graphs and provide a practical way of selecting or modifying module assignments and schedules such that the resulting synthesized data path requires a small number of test resources to test itself.
调度数据流图的测试资源的下界
在高级综合的各个阶段的资源的下界估计是必要的,以指导合成算法的最优解。在本文中,我们给出了使用内置自检(BIST)测试合成数据路径所需的测试资源(即测试模式生成器、签名分析器和CBILBO寄存器)数量的下界。评估是在计划的数据流图上执行的,并提供了一种选择或修改模块分配和计划的实用方法,这样得到的合成数据路径需要少量的测试资源来测试自身。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 求助全文
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信