{"title":"Dynamic capacity modeling with multiple re-entrant workflows in semiconductor assembly manufacturing","authors":"M. Zhang, J. Fu, Erick Zu","doi":"10.1109/COASE.2005.1506762","DOIUrl":null,"url":null,"abstract":"It is very challenging to gain competitive advantages in Flash assembly manufacturing mainly due to: widely and quickly fluctuating customer requests; with complicated workflows; and co-existence of new technology/equipment and legacy ones. In later 2003, Intel experienced capacity degradation mainly due to the introduction of multiple-chip products (MCP) with re-entrant workflows. We timely re-engineered our factory and generated new methodologies to achieve breakthrough operational excellence. We extended theory of constraints (TOC) to solve the problem of multiple bottlenecks, and developed the dynamic capacity model that captures variability of re-entrant manufacturing systems. Protective capacity (PC) and other parameters at constrained and near-constrained stations are regularly tracked and adjusted to accurately reflect line execution variability in terms of equipment, staff, and WIP. With the implementation and continuous improvement of these methodologies, we increase the factory output by 200% without major capital investment (avoiding millions of capital spending), we maintain 100% volume pass and line item pass for 41 weeks and still counting, and we achieve 30% unit cost cut and brought down subcon price by 26%, which results in over a dozen of millions of dollar cash saving for Intel.","PeriodicalId":181408,"journal":{"name":"IEEE International Conference on Automation Science and Engineering, 2005.","volume":"14 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2005-09-12","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"6","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"IEEE International Conference on Automation Science and Engineering, 2005.","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/COASE.2005.1506762","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 6

Abstract

It is very challenging to gain competitive advantages in Flash assembly manufacturing mainly due to: widely and quickly fluctuating customer requests; with complicated workflows; and co-existence of new technology/equipment and legacy ones. In later 2003, Intel experienced capacity degradation mainly due to the introduction of multiple-chip products (MCP) with re-entrant workflows. We timely re-engineered our factory and generated new methodologies to achieve breakthrough operational excellence. We extended theory of constraints (TOC) to solve the problem of multiple bottlenecks, and developed the dynamic capacity model that captures variability of re-entrant manufacturing systems. Protective capacity (PC) and other parameters at constrained and near-constrained stations are regularly tracked and adjusted to accurately reflect line execution variability in terms of equipment, staff, and WIP. With the implementation and continuous improvement of these methodologies, we increase the factory output by 200% without major capital investment (avoiding millions of capital spending), we maintain 100% volume pass and line item pass for 41 weeks and still counting, and we achieve 30% unit cost cut and brought down subcon price by 26%, which results in over a dozen of millions of dollar cash saving for Intel.
半导体组装制造中多可重入工作流的动态容量建模
在Flash组装制造中获得竞争优势是非常具有挑战性的,主要原因是:客户需求的广泛和快速波动;工作流程复杂;新技术/设备与旧技术/设备共存。在2003年后期,英特尔经历了容量下降,主要是由于引入了具有可重新进入工作流程的多芯片产品(MCP)。我们及时对工厂进行了重新设计,并制定了新的方法,以实现突破性的卓越运营。将约束理论扩展到多瓶颈问题,建立了可捕捉可再入制造系统可变性的动态容量模型。定期跟踪和调整受限和近受限站点的保护能力(PC)和其他参数,以准确反映设备、人员和在制品方面的生产线执行变化。随着这些方法的实施和不断改进,我们在没有重大资本投资的情况下将工厂产量提高了200%(避免了数百万美元的资本支出),我们保持了100%的批量通过率和生产线通过率41周,并且还在继续,我们实现了30%的单位成本削减,将次级价格降低了26%,这为英特尔节省了超过数百万美元的现金。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 求助全文
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信