{"title":"On the Necessity for Minimizing Risk Based Technology Qualification Variability: An Application to Offshore Floating Wind Turbines","authors":"S. Samarakoon, R. Ratnayake","doi":"10.1115/omae2020-18139","DOIUrl":null,"url":null,"abstract":"\n Technology qualification (TQ) has been employed to perform assessments to verify whether a new technology performs within pre-specified functional limits after an application. If a best available technology (BAT) is used in a new environment, it is considered as a new technology. The TQ is vital in the implementation of best available technology (BAT) in a new environment. Risk based technology qualification provides an optimal approach for performing TQ of a BAT when it is necessary to implement in a new environment. This manuscript first demonstrates the standard TQ process. Secondly, it presents development of a risk matrix for failure mode identification and consequence risk ranking (FMI&CRR). Thirdly, it demonstrates the use of FMI&CRR in a risk-based technology qualification process. Finally, it presents use of the risk matrix to perform TQ on moorings solutions that have been selected as a BAT for a floating wind turbine sub-system. Fuzzy inference system has been used to assess the risk rank to minimize the variability that causes due to experts’ performance variability. Illustrative risk based TQ assessment has been performed and presented. The developed risk based TQ process (TQP), fuzzy inference system supported risk rank estimation, and illustrative risk based TQ recommendation are significantly important for practitioners while performing FMI&CRR in larger scale offshore floating wind turbines’ TQ projects.","PeriodicalId":297013,"journal":{"name":"Volume 2A: Structures, Safety, and Reliability","volume":"53 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2020-08-03","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"1","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Volume 2A: Structures, Safety, and Reliability","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1115/omae2020-18139","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 1

Abstract

Technology qualification (TQ) has been employed to perform assessments to verify whether a new technology performs within pre-specified functional limits after an application. If a best available technology (BAT) is used in a new environment, it is considered as a new technology. The TQ is vital in the implementation of best available technology (BAT) in a new environment. Risk based technology qualification provides an optimal approach for performing TQ of a BAT when it is necessary to implement in a new environment. This manuscript first demonstrates the standard TQ process. Secondly, it presents development of a risk matrix for failure mode identification and consequence risk ranking (FMI&CRR). Thirdly, it demonstrates the use of FMI&CRR in a risk-based technology qualification process. Finally, it presents use of the risk matrix to perform TQ on moorings solutions that have been selected as a BAT for a floating wind turbine sub-system. Fuzzy inference system has been used to assess the risk rank to minimize the variability that causes due to experts’ performance variability. Illustrative risk based TQ assessment has been performed and presented. The developed risk based TQ process (TQP), fuzzy inference system supported risk rank estimation, and illustrative risk based TQ recommendation are significantly important for practitioners while performing FMI&CRR in larger scale offshore floating wind turbines’ TQ projects.
最小化基于风险的技术鉴定可变性的必要性:在海上浮式风力发电机上的应用
技术鉴定(TQ)已被用于进行评估,以验证新技术在申请后是否在预先规定的功能限制内执行。如果在新环境中使用了最佳可用技术(BAT),则将其视为新技术。TQ对于在新环境中实施最佳可用技术(BAT)至关重要。当需要在新环境中实施技术评估时,基于风险的技术鉴定为执行技术评估的TQ提供了最佳方法。本文首先演示了标准的TQ流程。其次,提出了用于故障模式识别和后果风险排序(FMI&CRR)的风险矩阵。第三,它展示了FMI&CRR在基于风险的技术鉴定过程中的应用。最后,介绍了使用风险矩阵对已被选为浮式风力涡轮机子系统BAT的系泊解决方案执行TQ的方法。采用模糊推理系统对风险等级进行评估,以最大限度地减少由于专家绩效的可变性而引起的可变性。说明性的基于风险的TQ评估已经执行并提出。开发的基于风险的TQ流程(TQP)、模糊推理系统支持的风险等级评估以及基于说明性风险的TQ建议对于大型海上浮式风力发电机组TQ项目的FMI&CRR实施具有重要意义。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 求助全文
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信