{"title":"Development of catenary and storage battery hybrid train system","authors":"H. Hirose, K. Yoshida, K. Shibanuma","doi":"10.1109/ESARS.2012.6387395","DOIUrl":null,"url":null,"abstract":"East Japan Railway Company has been developing a catenary and storage battery hybrid train system to decrease negative environmental impact by diesel trains operating on non-electrified lines. A quick charge test and final running test have been under way since the beginning of 2011. The functions of the catenary and storage battery hybrid train system on a non-electrified section and an electrified section and the results of test runs are shown in this paper.","PeriodicalId":243822,"journal":{"name":"2012 Electrical Systems for Aircraft, Railway and Ship Propulsion","volume":"21 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2012-12-24","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"27","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"2012 Electrical Systems for Aircraft, Railway and Ship Propulsion","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/ESARS.2012.6387395","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 27
Abstract
East Japan Railway Company has been developing a catenary and storage battery hybrid train system to decrease negative environmental impact by diesel trains operating on non-electrified lines. A quick charge test and final running test have been under way since the beginning of 2011. The functions of the catenary and storage battery hybrid train system on a non-electrified section and an electrified section and the results of test runs are shown in this paper.