{"title":"Updating a steel mill power system to improve reliability and decrease energy costs","authors":"J. Albaugh, M. Kornblit","doi":"10.1109/IAS.1993.299219","DOIUrl":null,"url":null,"abstract":"The authors provide insight into the planning and implementation of several significant cost saving and reliability improvements at a turn-of-the-century steel mill in Ohio. A number of target areas needing attention were identified. These included the cost of electrical energy, the cost to manufacture oxygen inhouse, and the need to accommodate future modernization projects. An option also under consideration included possible elimination of the oxygen facility if lower-cost oxygen could be purchased from an independent vendor. Preliminary evaluations, plans, and reviews took approximately two years before approval was received to proceed with the main oxygen plant project. Its bidding process and implementation took an additional year. The power system modernization project, which included addition of the power monitoring system, short-circuit retrofit of the 13.8 kV switchgear, distribution transformer isolation capability and two new double-ended low voltage substations took an additional six months.<<ETX>>","PeriodicalId":345027,"journal":{"name":"Conference Record of the 1993 IEEE Industry Applications Conference Twenty-Eighth IAS Annual Meeting","volume":"296 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"1993-10-02","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"2","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Conference Record of the 1993 IEEE Industry Applications Conference Twenty-Eighth IAS Annual Meeting","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/IAS.1993.299219","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 2

Abstract

The authors provide insight into the planning and implementation of several significant cost saving and reliability improvements at a turn-of-the-century steel mill in Ohio. A number of target areas needing attention were identified. These included the cost of electrical energy, the cost to manufacture oxygen inhouse, and the need to accommodate future modernization projects. An option also under consideration included possible elimination of the oxygen facility if lower-cost oxygen could be purchased from an independent vendor. Preliminary evaluations, plans, and reviews took approximately two years before approval was received to proceed with the main oxygen plant project. Its bidding process and implementation took an additional year. The power system modernization project, which included addition of the power monitoring system, short-circuit retrofit of the 13.8 kV switchgear, distribution transformer isolation capability and two new double-ended low voltage substations took an additional six months.<>
更新钢厂电力系统,提高可靠性,降低能源成本
作者对俄亥俄州一家世纪之交的钢铁厂的几项重大成本节约和可靠性改进的规划和实施提供了见解。确定了若干需要注意的目标领域。这些成本包括电能成本、在室内制造氧气的成本,以及适应未来现代化项目的需要。还在考虑的一项选择包括,如果可以从独立供应商处购买成本较低的氧气,可能会取消氧气设施。初步的评估、计划和审查花了大约两年的时间才获得批准,开始进行主要的制氧厂项目。它的投标过程和实施又花了一年时间。电力系统现代化项目,包括增加电力监控系统,对13.8千伏开关柜进行短路改造,配电变压器隔离能力和两个新的双端低压变电站,又花了六个月的时间
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 求助全文
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信