{"title":"Cycle Time in Assembly Line Balancing Problem","authors":"W. Grzechca","doi":"10.1109/ICSEng.2011.38","DOIUrl":null,"url":null,"abstract":"In the paper assembly line balancing problem is discussed. Author focuses on cycle time. The importance of its value is shown. Different measures of final results of assembly line balance are presented. A numerical example is calculated. At the end remarks and final conclusions are given.","PeriodicalId":387483,"journal":{"name":"2011 21st International Conference on Systems Engineering","volume":"2016 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2011-08-16","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"5","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"2011 21st International Conference on Systems Engineering","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/ICSEng.2011.38","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 5
Abstract
In the paper assembly line balancing problem is discussed. Author focuses on cycle time. The importance of its value is shown. Different measures of final results of assembly line balance are presented. A numerical example is calculated. At the end remarks and final conclusions are given.