Optimization of Furnace Working Index

Oke Kayode, Olayide Rasaq Adetunji, Adeboye Busayo, Idris Musibaudeen, Adefajo Abdulhafiz
{"title":"Optimization of Furnace Working Index","authors":"Oke Kayode, Olayide Rasaq Adetunji, Adeboye Busayo, Idris Musibaudeen, Adefajo Abdulhafiz","doi":"10.31603/benr.7402","DOIUrl":null,"url":null,"abstract":"The need for high quality product has necessitated the scientists to put in more effort to produce metal of high quality at lower price. This job considered the possibility of optimizing the product and brings out the product at cheaper price. Nigeria as a developing country needs metal for different purpose like construction of roads, houses, bridges and other infrastructure. Defined parameters of optimum work of EAF-50 comparing with the basic variant expenditure by limit has reduced by 33% (from 41,1 to 28,2 Ruble\\ton) Relative usage of electric energy by 51% (from 0,5463 to 0,2669 mw Hour/ton) Hour productivity rose by 74% (from 71,17 to 123,61 ton/hour).","PeriodicalId":330295,"journal":{"name":"Borobudur Engineering Review","volume":"407 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2022-09-30","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Borobudur Engineering Review","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.31603/benr.7402","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

Abstract

The need for high quality product has necessitated the scientists to put in more effort to produce metal of high quality at lower price. This job considered the possibility of optimizing the product and brings out the product at cheaper price. Nigeria as a developing country needs metal for different purpose like construction of roads, houses, bridges and other infrastructure. Defined parameters of optimum work of EAF-50 comparing with the basic variant expenditure by limit has reduced by 33% (from 41,1 to 28,2 Ruble\ton) Relative usage of electric energy by 51% (from 0,5463 to 0,2669 mw Hour/ton) Hour productivity rose by 74% (from 71,17 to 123,61 ton/hour).
炉膛工作指标的优化
对高质量产品的需要使科学家们必须付出更多的努力以低价格生产出高质量的金属。这项工作考虑了优化产品的可能性,并以更低的价格推出产品。作为一个发展中国家,尼日利亚需要金属用于不同的目的,比如修建道路、房屋、桥梁和其他基础设施。EAF-50的最佳工作定义参数与基本变种相比,按限制的支出减少了33%(从41.1到282,2卢布/吨)相对电能使用量减少了51%(从0,5463到0,2669兆瓦小时/吨)小时生产率提高了74%(从71,717到123,61吨/小时)。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 求助全文
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信