Adoption of business continuity planning processes in IT service management

Stewart H. C. Wan, Y. Chan
{"title":"Adoption of business continuity planning processes in IT service management","authors":"Stewart H. C. Wan, Y. Chan","doi":"10.1109/BDIM.2008.4540071","DOIUrl":null,"url":null,"abstract":"For any fault of the same severity level, traditional fault discovery and notification tools provide equal weighting from business points of view. To improve the fault correlation from business perspectives, we proposed a framework to automate network and system alerts with respect to its business service impact for proactive notification to IT operations management. This paper outlines the value of business continuity planning (BCP) during the course of service impact analysis, placing particular emphasis on the business perspective in the processes of IT service management. The framework explicitly employs BCP relevant processes in order to identify the relationships between business services and IT resources A practical case in IT operations to illustrate the concept was then conducted.","PeriodicalId":426943,"journal":{"name":"2008 3rd IEEE/IFIP International Workshop on Business-driven IT Management","volume":"56 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2008-04-07","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"10","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"2008 3rd IEEE/IFIP International Workshop on Business-driven IT Management","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/BDIM.2008.4540071","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 10

Abstract

For any fault of the same severity level, traditional fault discovery and notification tools provide equal weighting from business points of view. To improve the fault correlation from business perspectives, we proposed a framework to automate network and system alerts with respect to its business service impact for proactive notification to IT operations management. This paper outlines the value of business continuity planning (BCP) during the course of service impact analysis, placing particular emphasis on the business perspective in the processes of IT service management. The framework explicitly employs BCP relevant processes in order to identify the relationships between business services and IT resources A practical case in IT operations to illustrate the concept was then conducted.
在IT服务管理中采用业务连续性计划流程
对于相同严重级别的任何故障,传统的故障发现和通知工具从业务角度提供了相同的权重。为了从业务角度改进故障相关性,我们提出了一个框架,可以根据业务服务影响自动发出网络和系统警报,以便主动通知IT运营管理。本文概述了业务连续性计划(BCP)在服务影响分析过程中的价值,特别强调了IT服务管理过程中的业务视角。该框架明确地使用了BCP相关流程,以确定业务服务和IT资源之间的关系。然后,通过IT操作中的一个实际案例来说明这一概念。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 求助全文
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信