Analysis of Heightened Dam Working Behavior During Impoundment Process

SiChao Shen, Zhiqiang Xie, Y. Qi, Xi Qin
{"title":"Analysis of Heightened Dam Working Behavior During Impoundment Process","authors":"SiChao Shen, Zhiqiang Xie, Y. Qi, Xi Qin","doi":"10.1109/ICHCESWIDR54323.2021.9656388","DOIUrl":null,"url":null,"abstract":"In the second half of 2017, the Danjiangkou Reservoir carried out an experimental impoundment. Based on this impoundment, the three-dimensional finite element simulation technology is applied to simulate the temperature and stress distribution during the whole process from concrete placement to trial impoundment completion. The working behavior of the dam including change of temperature, stress, deformation and the open degree of joint surface during the impoundment process is emphatically analyzed and compared with the measured results. The results show that the whole dam section deforms downstream under the combined effect of the water rising and temperature decreasing during the impoundment process. The calculated results are consistent with the measured values. The temperature and stress in the dam body are not affected obviously during the impoundment process, but the surface temperature drops obviously, stress increases significantly on the surface and downstream slopes. The vertical joint faces of dam tend to be closed.","PeriodicalId":425834,"journal":{"name":"2021 7th International Conference on Hydraulic and Civil Engineering & Smart Water Conservancy and Intelligent Disaster Reduction Forum (ICHCE & SWIDR)","volume":"19 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2021-11-06","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"2021 7th International Conference on Hydraulic and Civil Engineering & Smart Water Conservancy and Intelligent Disaster Reduction Forum (ICHCE & SWIDR)","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/ICHCESWIDR54323.2021.9656388","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

Abstract

In the second half of 2017, the Danjiangkou Reservoir carried out an experimental impoundment. Based on this impoundment, the three-dimensional finite element simulation technology is applied to simulate the temperature and stress distribution during the whole process from concrete placement to trial impoundment completion. The working behavior of the dam including change of temperature, stress, deformation and the open degree of joint surface during the impoundment process is emphatically analyzed and compared with the measured results. The results show that the whole dam section deforms downstream under the combined effect of the water rising and temperature decreasing during the impoundment process. The calculated results are consistent with the measured values. The temperature and stress in the dam body are not affected obviously during the impoundment process, but the surface temperature drops obviously, stress increases significantly on the surface and downstream slopes. The vertical joint faces of dam tend to be closed.
蓄水过程中高坝工作特性分析
2017年下半年,丹江口水库进行了实验性蓄水。在此基础上,运用三维有限元模拟技术,模拟了从混凝土浇筑到试蓄水完成全过程的温度和应力分布。重点分析了水库蓄水过程中坝体的温度、应力、变形、节理面张开程度等工作特性,并与实测结果进行了比较。结果表明:在蓄水过程中,整个坝段下游在水位上升和温度下降的共同作用下发生变形。计算结果与实测值吻合较好。蓄水过程对坝体温度和应力影响不明显,但地表温度明显下降,地表和下游坡面应力明显增加。坝体竖向节理面有闭合的趋势。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 求助全文
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信