{"title":"Effort Estimation of Agile Development using Fuzzy Logic","authors":"Abhishek Saini, Laxmi Ahuja, S. Khatri","doi":"10.1109/ICRITO.2018.8748381","DOIUrl":null,"url":null,"abstract":"Effort Estimation is one of the most important factors for a successful project. Mostly it is done in the starting of the project life cycle. The vital activity in Agile project organization is a prediction of Software development this is because a project that is available in the beginning is not sufficient and moreover it is not clear because of the confliction. Getting accurate Effort Estimation for any software project has been a challenge always. In this paper fuzzy logic model is used to find Effort Estimation of Agile software development. In this model Fuzzy method is used to take the raw data of actual figures and output is given as the estimated effort available from industry. This way is more suitable when data is not available for analyzing by orthodox method. Basic idea is taken from Human where action and Inaction are not obvious, they are not clear. In this paper we will use three input variable to calculate Efforts estimation i.e User soty, Team Expertise and Complexity. In this manner, it is quite difficult to discover goals in more exact and clear simple way.","PeriodicalId":439047,"journal":{"name":"2018 7th International Conference on Reliability, Infocom Technologies and Optimization (Trends and Future Directions) (ICRITO)","volume":"97 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2018-08-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"9","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"2018 7th International Conference on Reliability, Infocom Technologies and Optimization (Trends and Future Directions) (ICRITO)","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/ICRITO.2018.8748381","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 9
Abstract
Effort Estimation is one of the most important factors for a successful project. Mostly it is done in the starting of the project life cycle. The vital activity in Agile project organization is a prediction of Software development this is because a project that is available in the beginning is not sufficient and moreover it is not clear because of the confliction. Getting accurate Effort Estimation for any software project has been a challenge always. In this paper fuzzy logic model is used to find Effort Estimation of Agile software development. In this model Fuzzy method is used to take the raw data of actual figures and output is given as the estimated effort available from industry. This way is more suitable when data is not available for analyzing by orthodox method. Basic idea is taken from Human where action and Inaction are not obvious, they are not clear. In this paper we will use three input variable to calculate Efforts estimation i.e User soty, Team Expertise and Complexity. In this manner, it is quite difficult to discover goals in more exact and clear simple way.