Vacant to Vibrant Implementation

S. Albro
{"title":"Vacant to Vibrant Implementation","authors":"S. Albro","doi":"10.5822/978-1-61091-901-2_5","DOIUrl":null,"url":null,"abstract":"Preparation for installing the Vacant to Vibrant projects began in the later stages of the design process, after the sites were finalized. There were permits to obtain, timelines to coordinate, and agreements to draft to formalize leases, contractors, and community partners. Construction began in fall 2014, in the third year of the project, and extended through spring 2015 (see appendix). The extensive preparatory work of selecting sites and creating detailed agreements paid off in this next phase of the project—once ground was broken, installation proceeded relatively smoothly. No costly surprises were hidden under the soil surface of parcels, and no major incidents disrupted work. This translated to projects that were built to specification, within the expected time frame, close to original budgeted costs (table 4-1).","PeriodicalId":417666,"journal":{"name":"Vacant to Vibrant","volume":"6 4","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"1900-01-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Vacant to Vibrant","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.5822/978-1-61091-901-2_5","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

Abstract

Preparation for installing the Vacant to Vibrant projects began in the later stages of the design process, after the sites were finalized. There were permits to obtain, timelines to coordinate, and agreements to draft to formalize leases, contractors, and community partners. Construction began in fall 2014, in the third year of the project, and extended through spring 2015 (see appendix). The extensive preparatory work of selecting sites and creating detailed agreements paid off in this next phase of the project—once ground was broken, installation proceeded relatively smoothly. No costly surprises were hidden under the soil surface of parcels, and no major incidents disrupted work. This translated to projects that were built to specification, within the expected time frame, close to original budgeted costs (table 4-1).
从空缺到充满活力的执行
在场地最终确定之后,在设计过程的后期阶段开始准备安装“空置到充满活力”的项目。需要获得许可,需要协调时间表,需要起草协议,以使租赁、承包商和社区合作伙伴正式化。该项目于2014年秋季开始建设,也就是项目的第三年,并一直延续到2015年春季(见附录)。在项目的下一阶段,选择场地和制定详细协议的大量准备工作得到了回报——一旦破土动工,安装就相对顺利地进行了。没有昂贵的意外隐藏在包裹的土壤表面下,也没有重大事故中断工作。这转化为在预期的时间框架内按照规范建造的项目,接近原始预算成本(表4-1)。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 求助全文
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:604180095
Book学术官方微信