Expanded IME with New Riser Gas Handling Operation Region

O. Gabaldon, Romar A Gonzalez Luis, Pedro Sousa, Chen Wei, Yuanhang Chen
{"title":"Expanded IME with New Riser Gas Handling Operation Region","authors":"O. Gabaldon, Romar A Gonzalez Luis, Pedro Sousa, Chen Wei, Yuanhang Chen","doi":"10.2118/210538-ms","DOIUrl":null,"url":null,"abstract":"The Influx Management Envelope (IME) is a proven tool to assess management of influxes taken during MPD operations. Currently, IME establishes limits of manageable influx volumes for given kick intensity/surface back-pressures, to hand over from primary to secondary barrier (i.e., well-control equipment). Opportunities exist for advanced, safe operations when influx circulation up the riser is a concern but dealing with the influx in the hole may introduce additional risks, such as imposing choke line friction pressures (CLFP), particularly in ultra-deepwater operations. A closed riser system allows for safe handling of influxes using the riser/MPD equipment, while isolating the wellbore with the subsea BOP and eliminating risks of fracturing the well or taking additional influxes. We propose expanding the current regions of the IME with a zone in which the decision can be made to circulate the influx to the riser, then isolate the well to handle the influx in the riser with MPD equipment, using the opportunities and methods being developed for industry use. Potential risks to the integrity of the system are analyzed and assessed versus reasonable scenarios. This work is consistent with the current work on providing guidelines for influx management with MPD (IM Annex to API-RP92S, under balloting process by API), and for managing gas in riser with closed riser systems (Riser Gas Handling (RGH) Guidelines, by the IADC UBO&MPD Committee).","PeriodicalId":336268,"journal":{"name":"Day 2 Wed, September 28, 2022","volume":"3 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2022-09-27","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"2","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Day 2 Wed, September 28, 2022","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.2118/210538-ms","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 2

Abstract

The Influx Management Envelope (IME) is a proven tool to assess management of influxes taken during MPD operations. Currently, IME establishes limits of manageable influx volumes for given kick intensity/surface back-pressures, to hand over from primary to secondary barrier (i.e., well-control equipment). Opportunities exist for advanced, safe operations when influx circulation up the riser is a concern but dealing with the influx in the hole may introduce additional risks, such as imposing choke line friction pressures (CLFP), particularly in ultra-deepwater operations. A closed riser system allows for safe handling of influxes using the riser/MPD equipment, while isolating the wellbore with the subsea BOP and eliminating risks of fracturing the well or taking additional influxes. We propose expanding the current regions of the IME with a zone in which the decision can be made to circulate the influx to the riser, then isolate the well to handle the influx in the riser with MPD equipment, using the opportunities and methods being developed for industry use. Potential risks to the integrity of the system are analyzed and assessed versus reasonable scenarios. This work is consistent with the current work on providing guidelines for influx management with MPD (IM Annex to API-RP92S, under balloting process by API), and for managing gas in riser with closed riser systems (Riser Gas Handling (RGH) Guidelines, by the IADC UBO&MPD Committee).
通过新的立管气体处理作业区域扩大了IME
流入管理信封(IME)是一种经过验证的工具,用于评估MPD作业期间所采取的流入管理。目前,IME在给定井涌强度/地面反压的情况下,确定了可管理的流入量的限制,以便从一级屏障移交到二级屏障(即井控设备)。当溢流沿着隔水管循环时,先进、安全的作业是有机会的,但处理井内的溢流可能会带来额外的风险,例如施加节流管摩擦压力(CLFP),特别是在超深水作业中。封闭立管系统允许使用立管/MPD设备安全处理流体,同时使用海底防喷器隔离井筒,消除了压裂井或额外注入流体的风险。我们建议扩大IME的现有区域,在该区域内,可以决定将流入流体循环到隔水管,然后利用MPD设备隔离井以处理流入隔水管的流体,利用正在开发的行业应用的机会和方法。根据合理的方案分析和评估系统完整性的潜在风险。这项工作与目前提供MPD流入管理指南(API- rp92s的IM附件,由API投票表决)以及使用封闭立管系统管理立管中的气体(IADC UBO&MPD委员会的立管气体处理(RGH)指南)的工作是一致的。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 求助全文
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信