RANCANG BANGUN ENERGI TERBARUKAN BAGI INDUSTRI PERTAHANAN GUNA MENDUKUNG PELAKSANAAN PERANG BERLARUT

Nur Aini Saura Putri
{"title":"RANCANG BANGUN ENERGI TERBARUKAN BAGI INDUSTRI PERTAHANAN GUNA MENDUKUNG PELAKSANAAN PERANG BERLARUT","authors":"Nur Aini Saura Putri","doi":"10.53866/jimi.v2i1.53","DOIUrl":null,"url":null,"abstract":"The defense industry is important in national defense, therefore energy security is needed. The purpose of this study is to analyze the threat of energy security in the event of a protracted war and the potential for solar energy. The method used in this research is to use PSVsyst in the design of PLTS. The results of energy security at PT Pindad only come from PLN 5,540 kVA and 3,465 kVA, Then for emergencies, PT Pindad has 2 Genset Units with a maximum capacity of 1.8 MW. With this situation, there is a threat of energy security in the event of a protracted war, namely the decision to supply electricity from PLN. Therefore, energy security is needed with the construction of PLTS in the PT Pindad area. From the data, PT Pindad's one hour electricity demand is 6,591 kWh/m2 and the building area that can be used for solar cell roof area is 33,775 m2 at PT Pindad.","PeriodicalId":414894,"journal":{"name":"Citizen : Jurnal Ilmiah Multidisiplin Indonesia","volume":"516 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2022-02-25","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"1","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Citizen : Jurnal Ilmiah Multidisiplin Indonesia","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.53866/jimi.v2i1.53","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 1

Abstract

The defense industry is important in national defense, therefore energy security is needed. The purpose of this study is to analyze the threat of energy security in the event of a protracted war and the potential for solar energy. The method used in this research is to use PSVsyst in the design of PLTS. The results of energy security at PT Pindad only come from PLN 5,540 kVA and 3,465 kVA, Then for emergencies, PT Pindad has 2 Genset Units with a maximum capacity of 1.8 MW. With this situation, there is a threat of energy security in the event of a protracted war, namely the decision to supply electricity from PLN. Therefore, energy security is needed with the construction of PLTS in the PT Pindad area. From the data, PT Pindad's one hour electricity demand is 6,591 kWh/m2 and the building area that can be used for solar cell roof area is 33,775 m2 at PT Pindad.
为国防工业设计可再生能源,以支持持续不断的战争
国防工业在国防中占有重要地位,因此需要能源安全。本研究的目的是分析在长期战争的情况下能源安全的威胁和太阳能的潜力。本研究采用的方法是在PLTS的设计中使用psvsystem。平达PT电站的能源安全结果仅来自PLN 5,540 kVA和3,465 kVA,然后为了应急,平达PT电站有2台发电机组,最大容量为1.8兆瓦。在这种情况下,如果发生一场旷日持久的战争,即决定从巴基斯坦人民解放军供电,就会对能源安全构成威胁。因此,在PT Pindad地区建设PLTS需要能源安全。由数据可知,PT Pindad每小时用电需求为6591 kWh/m2, PT Pindad可用于太阳能电池屋顶的建筑面积为33775 m2。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 求助全文
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信