Irsalina Maharani, F. T. D. Atmaji, Nopendri Nopendri
{"title":"PROPOSAL OF MAINTENANCE POLICY ON BARMAG FK6800 MACHINE IN FT3 PT XYZ USING RELIABILITY-CENTERED MAINTENANCE AND RISK-BASED MAINTENANCE METHOD","authors":"Irsalina Maharani, F. T. D. Atmaji, Nopendri Nopendri","doi":"10.2991/ICOIESE-18.2019.24","DOIUrl":null,"url":null,"abstract":"XYZ is a company that is engaged in the textile industry since 1974. XYZ has some different kinds of yarns which through several production processes in 24 hours a day to fulfill the market demands. Therefore, all machines have to be in the best condition as it can be. These machine should be maintained optimally so all production goals could be achieved with the minimum cost of maintenance. This study will use Reliability-Centered Maintenance (RCM) method to get the right preventive task and time interval for maintenance and Risk-Based Maintenance (RBM) method to find the risk value related to the economic aspect of the company. The output of the RCM method would be 18 Scheduled Discard Task and 6 Scheduled Condition Task for the subsystem machine and the time interval of the repair will be different depending on the type of tasks and components. The repair cost for preventive maintenance task in a year is IDR 2.029.266.063. By implementing the RBM method, the risk value will be IDR 269.768.775 if the company is not doing the preventive task proposed in this study. Keywords— Preventive Maintenance, Reliability-Centered Maintenance, Risk-Based Maintenance","PeriodicalId":172108,"journal":{"name":"Proceedings of the 2018 International Conference on Industrial Enterprise and System Engineering (IcoIESE 2018)","volume":"1973 5-6","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2019-03-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"2","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Proceedings of the 2018 International Conference on Industrial Enterprise and System Engineering (IcoIESE 2018)","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.2991/ICOIESE-18.2019.24","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 2
Abstract
XYZ is a company that is engaged in the textile industry since 1974. XYZ has some different kinds of yarns which through several production processes in 24 hours a day to fulfill the market demands. Therefore, all machines have to be in the best condition as it can be. These machine should be maintained optimally so all production goals could be achieved with the minimum cost of maintenance. This study will use Reliability-Centered Maintenance (RCM) method to get the right preventive task and time interval for maintenance and Risk-Based Maintenance (RBM) method to find the risk value related to the economic aspect of the company. The output of the RCM method would be 18 Scheduled Discard Task and 6 Scheduled Condition Task for the subsystem machine and the time interval of the repair will be different depending on the type of tasks and components. The repair cost for preventive maintenance task in a year is IDR 2.029.266.063. By implementing the RBM method, the risk value will be IDR 269.768.775 if the company is not doing the preventive task proposed in this study. Keywords— Preventive Maintenance, Reliability-Centered Maintenance, Risk-Based Maintenance