North Kuwait Jurassic Gas Experience of Expanding Multistage Completion Strategy for Managing Deep Tight Gas Development Challenges

Mohamed Abdel-Basset, Y. Al-Otaibi, Taha Blushi, A. Al-Dhafiri, M. Al-Mutawa, Mamoun. E. Abdelbagi, A. Hadi
{"title":"North Kuwait Jurassic Gas Experience of Expanding Multistage Completion Strategy for Managing Deep Tight Gas Development Challenges","authors":"Mohamed Abdel-Basset, Y. Al-Otaibi, Taha Blushi, A. Al-Dhafiri, M. Al-Mutawa, Mamoun. E. Abdelbagi, A. Hadi","doi":"10.2118/211390-ms","DOIUrl":null,"url":null,"abstract":"\n North Kuwait Jurassic Gas asset has strategic importance for Kuwait production strategy as the only non-associated gas producing fields in Kuwait. This paper demonstrates the added value, experience, challenges and lessons learned of recent paradigm shift in Jurassic tight gas wells’ completion strategy from cemented liner to multistage completion. A successful expansion of Multi-Stage Completion (MSC) technology has been achieved on field level led by integrated team efforts since early 2020 to date. This helps to enhance overall well production potential, selective stimulation, overcome reservoir and intervention operations challenges, and early production delivery.\n The Jurassic gas asset produces mainly from deep high pressure and temperature, conventional and unconventional tight carbonate reservoirs. The recovery from such complex heterogeneous reservoirs is extremely challenging if conventional development strategies are applied.\n Due to the high reservoir tightness, permeability contrast among different flow units and dual permeability effect (matrix and natural fractures), well productivity potential significantly depends on the effectiveness of subsequent stimulation treatments of such complex heterogeneous reservoir to improve well productivity and connect the natural fractures.\n Selecting proper well completion is critical to overcome such reservoir challenges and ensure efficient acid stimulation treatments of such unconventional formations that need convenient diversion mechanism during the stimulation to enhance the productivity of each individual reservoir layer, and enable future flexibility of selective re-stimulation and reservoir management.\n The asset team has applied a step change in completion strategy to open-hole HPHT multistage drop-ball completions using state-of-the-art MSC technologies including closable frac ports, full 3.5in monobore post milling and debris sub to protect the MSC string during upper completion operations. This is to overcome such reservoir complexity, eliminate wellbore cleaning and multiple perforation intervention operations challenges and risks, eliminate cement quality uncertainties, improve overall cost, and fast track well delivery to production to meet asset production target by significantly reducing operation time from approximately one month of plug and perf technique to less than one week of continuous and less subsurface intervention operations.\n Total of 23 new Multi-stage completions were successfully installed in last 2 years including 4 systems in horizontal unconventional Najmah reservoir with overall good production results and significant improvement in selective acid stimulation (matrix and Fracturing), intervention operations efficiency and fast well delivery to production. Therefore, the asset plans to continue expansion in Multi-stage completion strategy.\n Based on gained experience, an integrated protocol for multi-stage candidate well selection, staging design and installation procedures workflow has been built by the integrated multidisciplinary team to ensure standard process across fields which can be used for application in other fields.","PeriodicalId":249690,"journal":{"name":"Day 2 Tue, November 01, 2022","volume":"236 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2022-10-31","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Day 2 Tue, November 01, 2022","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.2118/211390-ms","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

Abstract

North Kuwait Jurassic Gas asset has strategic importance for Kuwait production strategy as the only non-associated gas producing fields in Kuwait. This paper demonstrates the added value, experience, challenges and lessons learned of recent paradigm shift in Jurassic tight gas wells’ completion strategy from cemented liner to multistage completion. A successful expansion of Multi-Stage Completion (MSC) technology has been achieved on field level led by integrated team efforts since early 2020 to date. This helps to enhance overall well production potential, selective stimulation, overcome reservoir and intervention operations challenges, and early production delivery. The Jurassic gas asset produces mainly from deep high pressure and temperature, conventional and unconventional tight carbonate reservoirs. The recovery from such complex heterogeneous reservoirs is extremely challenging if conventional development strategies are applied. Due to the high reservoir tightness, permeability contrast among different flow units and dual permeability effect (matrix and natural fractures), well productivity potential significantly depends on the effectiveness of subsequent stimulation treatments of such complex heterogeneous reservoir to improve well productivity and connect the natural fractures. Selecting proper well completion is critical to overcome such reservoir challenges and ensure efficient acid stimulation treatments of such unconventional formations that need convenient diversion mechanism during the stimulation to enhance the productivity of each individual reservoir layer, and enable future flexibility of selective re-stimulation and reservoir management. The asset team has applied a step change in completion strategy to open-hole HPHT multistage drop-ball completions using state-of-the-art MSC technologies including closable frac ports, full 3.5in monobore post milling and debris sub to protect the MSC string during upper completion operations. This is to overcome such reservoir complexity, eliminate wellbore cleaning and multiple perforation intervention operations challenges and risks, eliminate cement quality uncertainties, improve overall cost, and fast track well delivery to production to meet asset production target by significantly reducing operation time from approximately one month of plug and perf technique to less than one week of continuous and less subsurface intervention operations. Total of 23 new Multi-stage completions were successfully installed in last 2 years including 4 systems in horizontal unconventional Najmah reservoir with overall good production results and significant improvement in selective acid stimulation (matrix and Fracturing), intervention operations efficiency and fast well delivery to production. Therefore, the asset plans to continue expansion in Multi-stage completion strategy. Based on gained experience, an integrated protocol for multi-stage candidate well selection, staging design and installation procedures workflow has been built by the integrated multidisciplinary team to ensure standard process across fields which can be used for application in other fields.
扩展多级完井策略以应对深部致密气开发挑战的北科威特侏罗系天然气经验
作为科威特唯一的非伴生气田,North Kuwait Jurassic Gas资产对科威特的生产战略具有重要的战略意义。本文阐述了近期侏罗系致密气井完井策略从固井尾管到多级完井的转变所带来的价值、经验、挑战和经验教训。自2020年初以来,在综合团队的领导下,多阶段完井(MSC)技术在现场成功扩展。这有助于提高油井的整体生产潜力,选择性增产,克服油藏和干预作业的挑战,以及早期生产交付。侏罗系天然气主要产自深部高压高温、常规和非常规致密碳酸盐岩储层。如果采用常规开发策略,这种复杂非均质油藏的采收率极具挑战性。由于储层致密性高,不同流动单元之间的渗透率差异大,以及双重渗透率效应(基质和天然裂缝),因此这种复杂非均质储层的产能潜力很大程度上取决于后续增产措施的有效性,以提高油井产能并连通天然裂缝。选择合适的完井对于克服此类油藏挑战至关重要,并确保对非常规地层进行有效的酸增产处理,这些非常规地层在增产过程中需要方便的导流机制,以提高每个储层的产能,并实现未来选择性再增产和油藏管理的灵活性。在裸眼高温高压多级落球完井中,资产团队采用了最先进的MSC技术,包括关闭压裂口、全3.5英寸单孔后磨和碎屑短节,以在上部完井作业中保护MSC管柱。该技术旨在克服此类油藏的复杂性,消除井筒清洗和多次射孔干预作业的挑战和风险,消除水泥质量的不确定性,提高总体成本,并通过将作业时间从大约一个月的封井和射孔技术减少到不到一周的连续和更少的地下干预作业,快速实现油井交付,以满足资产生产目标。在过去的两年中,共成功安装了23个新的多级完井,其中包括在Najmah水平非常规油藏中安装的4个系统,总体上生产效果良好,在选择性酸增产(基质和压裂)、修井作业效率和快速投产方面有了显著提高。因此,该资产计划继续采用多级完井策略进行扩张。综合多学科团队根据积累的经验,建立了多阶段候选井选择、阶段设计和安装程序工作流程的综合协议,以确保跨领域的标准流程,可用于其他领域。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 求助全文
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信