Analysis of the plant and operational requirements for the design of a flexible and new generation LCC HVDC system: the Sa.Co.I 3 technology case

A. Battaglia, L. Buono, R. De Zan, E. Di Bartolomeo, M. Marzinotto, F. Palone, M. Pazienza, F. Pede, L. Michi, E. Carlini, T. B. Scirocco, G. Bruno, R. Gnudi, G. Pecoraro, C. Pisani
{"title":"Analysis of the plant and operational requirements for the design of a flexible and new generation LCC HVDC system: the Sa.Co.I 3 technology case","authors":"A. Battaglia, L. Buono, R. De Zan, E. Di Bartolomeo, M. Marzinotto, F. Palone, M. Pazienza, F. Pede, L. Michi, E. Carlini, T. B. Scirocco, G. Bruno, R. Gnudi, G. Pecoraro, C. Pisani","doi":"10.1109/AEIT-HVDC.2019.8740651","DOIUrl":null,"url":null,"abstract":"The SA.CO.I 2 HVDC link, connecting Sardinia, Corsica and Italian mainland, was the first multi-terminal scheme to enter in operation in Europe; after 30 year of operation it is still the only multi-terminal link in ENTOSE network. In order to face the new challenges of renewable energy integration, Terna and EDF are going to refurbish and upgrade the existing link. Low short circuit power and inertia, as well as fast recovery after dc-line fault are some of the main issues to be overcome. The paper deals with the preliminary studies on Sa.Co.I 3 project, aimed at identifying the required link performances and technological solutions.","PeriodicalId":186931,"journal":{"name":"2019 AEIT HVDC International Conference (AEIT HVDC)","volume":"35 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2019-05-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"1","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"2019 AEIT HVDC International Conference (AEIT HVDC)","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/AEIT-HVDC.2019.8740651","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 1

Abstract

The SA.CO.I 2 HVDC link, connecting Sardinia, Corsica and Italian mainland, was the first multi-terminal scheme to enter in operation in Europe; after 30 year of operation it is still the only multi-terminal link in ENTOSE network. In order to face the new challenges of renewable energy integration, Terna and EDF are going to refurbish and upgrade the existing link. Low short circuit power and inertia, as well as fast recovery after dc-line fault are some of the main issues to be overcome. The paper deals with the preliminary studies on Sa.Co.I 3 project, aimed at identifying the required link performances and technological solutions.
分析设计灵活的新一代LCC高压直流系统的电厂和运行要求:Sa.Co.I . 3技术案例
连接撒丁岛、科西嘉岛和意大利大陆的SA.CO.I . 2高压直流输电线路是第一个在欧洲投入运营的多终端方案;经过30年的运营,它仍然是ENTOSE网络中唯一的多终端链路。为了应对可再生能源整合的新挑战,Terna和EDF将对现有的线路进行翻新和升级。低短路功率和惯性,以及直流线路故障后的快速恢复是需要克服的主要问题。本文对Sa.Co.I . 3项目进行了初步研究,旨在确定所需的链路性能和技术解决方案。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 求助全文
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信