Coordinated maintenance scheduling of Gencos and Transcos in restructured power systems

T. Geetha, K. Shanti Swarup
{"title":"Coordinated maintenance scheduling of Gencos and Transcos in restructured power systems","authors":"T. Geetha, K. Shanti Swarup","doi":"10.1109/POWERI.2006.1632515","DOIUrl":null,"url":null,"abstract":"This paper proposes a methodology for the development of automatic scheduling techniques, for preventive maintenance of generating units and lines, in a competitive electric energy environment, with the inclusion of transmission constraints and forced outage rates, over a specified operational period. For generator maintenance the objective of the ISO is to maintain adequate level of reliability throughout the operational period (for which Bender's decomposition technique is used) and the objective of the GENCO is to maximize profit or to minimize loss in profit (for which transmission constrained price based unit commitment, TCPBUC, based on Lagrangian relaxation method is used). For line maintenance minimum cost model bender's technique with adequate level of reliability is used. A coordinating technique using penalty factors is incorporated to converge the conflicting objectives. The transmission constraints are modeled using DC sensitivity factors. Case study with a 6 bus, 3 generator, 11 line system is presented and discussed","PeriodicalId":191301,"journal":{"name":"2006 IEEE Power India Conference","volume":"7 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2006-06-05","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"9","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"2006 IEEE Power India Conference","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/POWERI.2006.1632515","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 9

Abstract

This paper proposes a methodology for the development of automatic scheduling techniques, for preventive maintenance of generating units and lines, in a competitive electric energy environment, with the inclusion of transmission constraints and forced outage rates, over a specified operational period. For generator maintenance the objective of the ISO is to maintain adequate level of reliability throughout the operational period (for which Bender's decomposition technique is used) and the objective of the GENCO is to maximize profit or to minimize loss in profit (for which transmission constrained price based unit commitment, TCPBUC, based on Lagrangian relaxation method is used). For line maintenance minimum cost model bender's technique with adequate level of reliability is used. A coordinating technique using penalty factors is incorporated to converge the conflicting objectives. The transmission constraints are modeled using DC sensitivity factors. Case study with a 6 bus, 3 generator, 11 line system is presented and discussed
重组电力系统中发电和输电系统的协调维护计划
本文提出了一种开发自动调度技术的方法,用于发电机组和线路的预防性维护,在竞争激烈的电力环境中,包括传输限制和强制停电率,在指定的运行期间。对于发电机维护,ISO的目标是在整个运行期间保持足够的可靠性水平(为此使用本德尔分解技术),GENCO的目标是最大化利润或最小化利润损失(为此使用基于拉格朗日松弛方法的基于传输约束价格的单位承诺TCPBUC)。对于线路维护成本最低的模型弯管机技术,具有足够的可靠性水平。采用惩罚因子的协调技术使冲突目标收敛。利用直流灵敏度因子对传输约束进行建模。以6母线、3发电机、11线系统为例进行了分析和讨论
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 求助全文
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:604180095
Book学术官方微信