Public-Private Partnerships and the Privatization of Financing: An Incomplete Contracts Approach

Jean-Etienne de Bettignies, T. W. Ross
{"title":"Public-Private Partnerships and the Privatization of Financing: An Incomplete Contracts Approach","authors":"Jean-Etienne de Bettignies, T. W. Ross","doi":"10.2139/ssrn.1014270","DOIUrl":null,"url":null,"abstract":"Governments have begun to embrace public-private partnerships (P3s) as vehicles for providing public services. This paper considers the controversial question of when private financing of public projects is optimal. Private development can dominate public financing through more efficient termination decisions for bad projects, resolving soft budget constraint problems. Due to contractual incompleteness and externalities, on the other hand, private developers cannot commit to large debt repayments, and hence can finance only a subset of valuable projects. Public developers, who do not face the same commitment problems, can finance a larger set of projects.","PeriodicalId":190860,"journal":{"name":"Queen's: Managerial Economics (Topic)","volume":"21 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2007-08-08","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"90","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Queen's: Managerial Economics (Topic)","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.2139/ssrn.1014270","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 90

Abstract

Governments have begun to embrace public-private partnerships (P3s) as vehicles for providing public services. This paper considers the controversial question of when private financing of public projects is optimal. Private development can dominate public financing through more efficient termination decisions for bad projects, resolving soft budget constraint problems. Due to contractual incompleteness and externalities, on the other hand, private developers cannot commit to large debt repayments, and hence can finance only a subset of valuable projects. Public developers, who do not face the same commitment problems, can finance a larger set of projects.
公私伙伴关系与融资私有化:一种不完全合同方法
政府已经开始接受公私合作伙伴关系(p3)作为提供公共服务的工具。本文研究了一个有争议的问题,即公共项目的私人融资何时是最优的。私人开发可以通过对不良项目更有效的终止决策来主导公共融资,从而解决软预算约束问题。另一方面,由于合同的不完全性和外部性,私人开发商无法承诺大量偿还债务,因此只能为一小部分有价值的项目提供融资。公共开发商不面临同样的承诺问题,可以为更多的项目提供资金。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 求助全文
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:604180095
Book学术官方微信
小红书